ITAC Assessment: LM0118
ITAC logo
ITAC Assessment: LM0118
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product sand castings
NAICS 331511: Iron Foundries
SIC 3321: Gray and Ductile Iron Foundries
Sales Range $5
M
to 10
M
# of Employees 75
Plant Area 55,000
ft2
Annual Production 7,739,257
lb
Production Hrs. Annual 3,012
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $280,787 5,111,926
kWh
Electricity Demand $161,496 23,176
kW-mo/yr
Natural Gas $91,636 9,778
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,575 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,104

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 4.431: Train operators for maximum operating efficiency $8,571 $10,004 $2,571
46,475
kWh
- $6,000
02 2.7142: Utilize higher efficiency lamps and/or ballasts $969 $2,578 $670
12,111
kWh
$299
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,104 $425 $3,501
63,247
kWh
$603
-
kW-mo/yr
-
04 2.4224: Upgrade controls on compressors $5,931 - $5,931
107,200
kWh
- -
TOTAL RECOMMENDED $19,575 $13,007 $12,673
229,033
kWh
$902
-
kW-mo/yr
$6,000
TOTAL IMPLEMENTED $4,104 $425 $3,501
63,247
kWh
$603
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs