ITAC Assessment: NC0530
ITAC logo
ITAC Assessment: NC0530
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Air filters
NAICS 333413: Industrial and Commercial Fan and Blower and Air Purification Equipment Manufacturing
SIC 3564: Industrial and Commercial Fans and Blowers and Air Purification Equipment
Sales Range $50
M
to 100
M
# of Employees 640
Plant Area 521,523
ft2
Annual Production 33,000,000
pieces
Production Hrs. Annual 2,750
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $275,917 5,237,297
kWh
Electricity Demand $99,128 11,650
kW-mo/yr
Electricity Fees $1,647 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $35,957 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,402

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7241: Install outside air damper / economizer on hvac unit $14,069 $54,000 $14,069
266,964
kWh
- - -
02 2.3135: Schedule routine maintenance during non-operating periods $1,055 - - $1,055
-
kW-mo/yr
- -
03 2.3132: Recharge batteries on during off-peak demand periods $1,962 $200 $440
-
kWh
$1,522
-
kW-mo/yr
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,946 $18,000 $4,946
93,844
kWh
- - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $2,542 $5,000 $1,888
35,818
kWh
$654
-
kW-mo/yr
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $443 $200 $594
11,280
kWh
$209
-
kW-mo/yr
$(-200.0) $(-160.0)
07 2.4239: Eliminate or reduce compressed air usage $1,767 $4,000 $534
10,141
kWh
$1,233
-
kW-mo/yr
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $2,623 $2,350 $1,724
32,710
kWh
$654
-
kW-mo/yr
- $245
09 2.7135: Install occupancy sensors $2,127 $6,420 $2,127
40,364
kWh
- - -
10 2.7111: Reduce illumination to minimum necessary levels $686 $563 $425
8,064
kWh
$147
-
kW-mo/yr
- $114
11 2.7142: Utilize higher efficiency lamps and/or ballasts $632 $176 $248
4,702
kWh
$55
-
kW-mo/yr
- $329
12 2.7134: Use photocell controls $341 $80 $341
6,480
kWh
- - -
13 2.7142: Utilize higher efficiency lamps and/or ballasts $763 $2,400 $528
10,021
kWh
$235
-
kW-mo/yr
- -
14 2.4151: Develop a repair/replace policy $2,001 $4,256 $1,487
28,207
kWh
$514
-
kW-mo/yr
- -
TOTAL RECOMMENDED $35,957 $97,645 $29,351
548,595
kWh
$6,278
-
kW-mo/yr
$(-200.0) $528
TOTAL IMPLEMENTED $9,402 $7,745 $4,918
84,963
kWh
$4,156
-
kW-mo/yr
$(-200.0) $528
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings