| Assessment Year | 2005 |
|---|---|
| Principal Product | Investment castings |
| NAICS | 331512: Steel Investment Foundries |
| SIC | 3324: Steel Investment Foundries |
| Sales Range | $1 M to 5M |
| # of Employees | 20 |
| Plant Area |
15,000
ft2
|
| Annual Production | 200,000
lb
|
| Production Hrs. Annual | 2,000
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $43,385 | 430,804 |
kWh
|
$0.10 |
| Electricity Demand | $20,740 | 3,096 |
kW-mo/yr
|
$6.70 |
| Electricity Fees | $(-591.0) | - |
|
- |
| Natural Gas | $34,444 | 4,318 |
MMBtu
|
$7.98 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $73,002 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $45,002 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Primary Product Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $709 | $300 |
$489
4,839
kWh
|
$220
-
kW-mo/yr
|
- | - | - | |
| 02 | 2.2136: Install / repair insulation on steam lines | $1,029 | $683 | - | - |
$1,029
-
MMBtu
|
- | - | |
| 03 | 2.2135: Repair and eliminate steam leaks | $764 | $240 | - | - |
$764
-
MMBtu
|
- | - | |
| 04 | 4.513: Re-arrange equipment layout to reduce labor costs | $28,000 | $1,260 | - | - | - | $28,000 | - | |
| 05 | 4.652: Replace existing equipment with more suitable substitutes | $8,750 | $200 | - | - | - | $8,750 | - | |
| 06 | 4.122: Develop standard procedures to improve internal yields | $16,875 | $2,150 | - | - | - | - | $16,875 | |
| 07 | 4.423: Move product using mechanical means | $16,875 | $1,600 | - | - | - | - | $16,875 | |
| TOTAL RECOMMENDED | $73,002 | $6,433 |
$489
4,839
kWh
|
$220
-
kW-mo/yr
|
$1,793
-
MMBtu
|
$36,750 | $33,750 | ||
| TOTAL IMPLEMENTED | $45,002 | $5,173 |
$489
4,839
kWh
|
$220
-
kW-mo/yr
|
$1,793
-
MMBtu
|
$8,750 | $33,750 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Primary Product Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs