ITAC Assessment: WI0301
ITAC logo
ITAC Assessment: WI0301
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Seating Products
NAICS
n/a
SIC 3999: Manufacturing Industries, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 280
Plant Area 154,000
ft2
Annual Production 379,000
pieces
Production Hrs. Annual 4,800
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $88,248 3,207,503
kWh
Electricity Demand $75,880 8,671
kW-mo/yr
Electricity Fees $532 -
Natural Gas $126,035 28,977
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $69,419 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,531

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings Other Liquid (haz) Savings Administrative Changes Savings Primary Raw Material Savings
01 2.2426: Use waste heat from flue gases to heat space conditioning air $36,464 $13,000 - $36,464
-
MMBtu
- - - -
02 2.8113: Purchase gas directly from a contract gas supplier $12,129 $500 - $12,129
-
MMBtu
- - - -
03 3.3131: Use evaporation to concentrate material $10,763 $23,000 - $(-2,850.0)
-
MMBtu
- $13,613
-
gal
- -
04 3.2123: Convert to high volume low pressure (hvlp) paint guns $4,590 $1,000 - - - - - $4,590
05 3.4113: Treat and reuse rinse waters $3,396 $1,735 - - $3,396
-
Tgal
- - -
06 4.321: Optimize production lot sizes and inventories $793 - - - - - $793 -
07 2.2511: Insulate bare equipment $768 $998 - $768
-
MMBtu
- - - -
08 2.7314: Reduce ventilation air $346 $1,000 $26
879
kWh
$320
-
MMBtu
- - - -
09 2.7135: Install occupancy sensors $170 $300 $170
5,862
kWh
- - - - -
TOTAL RECOMMENDED $69,419 $41,533 $196
6,741
kWh
$46,831
-
MMBtu
$3,396
-
Tgal
$13,613
-
gal
$793 $4,590
TOTAL IMPLEMENTED $11,531 $23,998 - $(-2,082.0)
-
MMBtu
- $13,613
-
gal
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Disposal Savings Other Liquid (haz) Savings Administrative Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs