Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

276

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Copper rolling, drawing, extruding, and alloying
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LE0349 #04 Y:2012 Install compressor air intakes in coolest locations $1,253 $1,248
LE0349 #03 Y:2012 Reduce the pressure of compressed air to the minimum required $6,249 $40
LE0349 #02 Y:2012 Replace electrically-operated equipment with fossil fuel equipment $85,383 $310,000
LE0349 #01 Y:2012 Utilize higher efficiency lamps and/or ballasts $2,018 $7,190
OK0834 #09 Y:2012 Minimize operation of equipment maintained in standby condition $5,100 -
OK0834 #08 Y:2012 Upgrade controls on compressors $4,641 -
OK0834 #07 Y:2012 Reduce the pressure of compressed air to the minimum required $1,772 $13,200
OK0834 #06 Y:2012 Eliminate or reduce compressed air usage $3,509 $2,000
OK0834 #05 Y:2012 Eliminate leaks in inert gas and compressed air lines/ valves $1,755 $1,500
OK0834 #04 Y:2012 Keep boiler tubes clean $810 $500
OK0834 #03 Y:2012 Install occupancy sensors $1,900 $900
OK0834 #02 Y:2012 Utilize higher efficiency lamps and/or ballasts $2,600 $18,285
OK0834 #01 Y:2012 Apply for tax-free status for energy purchases $3,800 -
SU0315 #08 Y:2011 Upgrade obsolete equipment $82 $436
SU0315 #07 Y:2011 Optimize plant power factor $8,366 $42,403
SU0315 #06 Y:2011 Change procedures / equipment / operating conditions $33,502 $167,290
SU0315 #05 Y:2011 Conserve energy by efficient use of vending machines $149 $652
SU0315 #04 Y:2011 Utilize higher efficiency lamps and/or ballasts $317 $140
SU0315 #03 Y:2011 Install compressor air intakes in coolest locations $8,269 $1,357
SU0315 #02 Y:2011 Recover and reuse spent acid baths $28,847 $792