Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

475

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Other aluminum rolling, drawing, and extruding
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
CI0054 #09 Y:2025 Install occupancy sensors $2,116 $4,650
CI0054 #08 Y:2025 Reduce the pressure of compressed air to the minimum required $5,048 $25
CI0054 #07 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $8,158 $32,500
CI0054 #06 Y:2025 Eliminate or reduce compressed air usage $9,124 $500
CI0054 #05 Y:2025 Use most efficient type of electric motors $24,625 $6,460
CI0054 #04 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $63,388 $5,500
CI0054 #03 Y:2025 Use solar heat to make electricty $83,244 $844,770
CI0054 #02 Y:2025 Adopt in-house material generation $173,671 $246,000
CI0054 #01 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $178,607 $160,000
MI0455 #06 Y:2024 Install occupancy sensors $1,323 $1,578
MI0455 #05 Y:2024 Eliminate or reduce compressed air usage $5,478 $80
MI0455 #04 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $17,287 $1,620
MI0455 #03 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $20,861 $35,685
MI0455 #02 Y:2024 Change rate schedules or other changes in utility service $24,930 $3,200
MI0455 #01 Y:2024 Optimize plant power factor $46,100 $45,007
NT0026 #05 Y:2024 Apply for investment incentives $133,205 -
NT0026 #04 Y:2024 Optimize plant power factor $122,072 $90,330
NT0026 #03 Y:2024 Utilize higher efficiency lamps and/or ballasts $109,656 $54,987
NT0026 #02 Y:2024 Reduce the pressure of compressed air to the minimum required $22,341 -
NT0026 #01 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $10,160 $5,609