Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

193

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Secondary smelting and alloying of aluminum
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WM0194 #09 Y:2023 Close holes and openings in building such as broken windows $9,970 $2,832
WM0194 #08 Y:2023 Replace existing hvac unit with high efficiency model $14,050 $20,480
WM0194 #07 Y:2023 Replace hydraulic / pneumatic equipment with electric equipment $15,440 $9,000
WM0194 #06 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $35,203 $110,000
WM0194 #05 Y:2023 Eliminate or reduce compressed air usage $38,839 $6,800
WM0194 #04 Y:2023 Pay bills on time to avoid late fees $41,818 -
WM0194 #03 Y:2023 Utilize higher efficiency lamps and/or ballasts $41,924 $39,795
WM0194 #02 Y:2023 Replace city water with recycled water via cooling tower $161,122 $300,000
WM0194 #01 Y:2023 Use waste heat from hot flue gases to preheat $202,110 $250,000
WM0189 #08 Y:2022 Close holes and openings in building such as broken windows $614 $880
WM0189 #07 Y:2022 Eliminate leaks in inert gas and compressed air lines/ valves $683 $2,500
WM0189 #06 Y:2022 Install compressor air intakes in coolest locations $873 $5,496
WM0189 #05 Y:2022 Use or replace with energy efficient substitutes $1,529 $2,900
WM0189 #04 Y:2022 Combine utility meters $2,274 -
WM0189 #03 Y:2022 Improve combustion control capability $4,948 $15,600
WM0189 #02 Y:2022 Utilize higher efficiency lamps and/or ballasts $31,780 $20,906
WM0189 #01 Y:2022 Use waste heat from hot flue gases to preheat $38,963 $75,000
TT0242 #06 Y:2020 Install timers and/or thermostats $1,854 $1,700
TT0242 #05 Y:2020 Eliminate leaks in inert gas and compressed air lines/ valves $4,251 $263
TT0242 #04 Y:2020 Meter recycled water (to reduce sewer charges) $13,945 $1,900