Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

11

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Secondary smelting and alloying of aluminum
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UM0378 #07 Y:2010 Recover heat from exhausted steam, hot air or hot water $3,345 $7,800
UM0378 #06 Y:2010 Recover waste heat from equipment $3,599 $1,500
UM0378 #05 Y:2010 Analyze flue gas for proper air/fuel ratio $68,485 $2,000
UM0378 #03 Y:2010 Install compressor air intakes in coolest locations $755 $1,000
UM0378 #02 Y:2010 Upgrade controls on compressors $2,693 $3,996
UM0378 #01 Y:2010 Use adjustable frequency drive or multiple speed motors on existing system $14,490 $31,638
IC0082 #07 Y:2004 Reduce the pressure of compressed air to the minimum required $311 $282,150
IC0082 #05 Y:2004 Use or replace with energy efficient substitutes $7,283 $1,450
IC0082 #04 Y:2004 Re-size charging openings or add movable cover or door $54,932 $8,421
IC0082 #03 Y:2004 Use waste heat to produce steam to drive a steam turbine-generator $295,385 $90,783
IC0082 #01 Y:2004 Replace heat treating oven with more efficient unit $158,811 -