Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

843

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Alumina and aluminum production and processing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UA0159 #08 Y:2016 Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $88,918 $2,750
UA0159 #07 Y:2016 Use adjustable frequency drive or multiple speed motors on existing system $16,391 $20,000
UA0159 #06 Y:2016 Turn off equipment when not in use $82,252 $55
UA0159 #05 Y:2016 Utilize higher efficiency lamps and/or ballasts $219,290 $1,047,803
UA0159 #04 Y:2016 Utilize energy-efficient belts and other improved mechanisms $12,382 $2,400
UA0159 #03 Y:2016 Cover open tanks $286,063 $140,000
UA0159 #02 Y:2016 Use adjustable frequency drive or multiple speed motors on existing system $193,333 $84,408
UA0159 #01 Y:2016 Use waste heat from hot flue gases to preheat $660,652 $392,000
AM0692 #09 Y:2015 Make a practice of turning off lights when not needed $480 $10
AM0692 #08 Y:2015 Disconnect ballasts $533 $1,100
AM0692 #07 Y:2015 Reduce the pressure of compressed air to the minimum required $870 $6
AM0692 #06 Y:2015 Use synthetic lubricant $1,560 -
AM0692 #05 Y:2015 Utilize energy-efficient belts and other improved mechanisms $2,115 -
AM0692 #04 Y:2015 Change rate schedules or other changes in utility service $2,124 -
AM0692 #03 Y:2015 Utilize higher efficiency lamps and/or ballasts $9,880 $16,750
AM0692 #02 Y:2015 Eliminate leaks in inert gas and compressed air lines/ valves $11,830 $5,000
AM0692 #01 Y:2015 Eliminate or reduce compressed air usage $12,970 $10,000
UK1508 #14 Y:2015 Eliminate or reduce compressed air usage $7,224 $13,658
UK1508 #13 Y:2015 Eliminate or reduce compressed air usage $21,138 $12,000
UK1508 #12 Y:2015 Install compressor air intakes in coolest locations $1,063 $3,260