48
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UD0888 #21 Y:2013 | 21 | 2013 | Convert from batch operation to continuous processing | $4,400 | - | |
| UD0888 #20 Y:2013 | 20 | 2013 | Use heat in flue gases to preheat products or materials | $412 | - | |
| UD0888 #19 Y:2013 | 19 | 2013 | Improve combustion control capability | $262,538 | $700,000 | |
| UD0888 #18 Y:2013 | 18 | 2013 | Reduce combustion air flow to optimum | $21,538 | $2,500 | |
| UD0888 #17 Y:2013 | 17 | 2013 | Preheat combustion air with waste heat | $1,679 | $5,000 | |
| UD0888 #16 Y:2013 | 16 | 2013 | Insulate bare equipment | $6,807 | $894 | |
| UD0888 #15 Y:2013 | 15 | 2013 | Utilize higher efficiency lamps and/or ballasts | $913 | $2,119 | |
| UD0888 #14 Y:2013 | 14 | 2013 | Develop a repair/replace policy | $3,770 | - | |
| UD0888 #13 Y:2013 | 13 | 2013 | Utilize controls to operate equipment only when needed | $10,444 | $4,500 | |
| UD0888 #12 Y:2013 | 12 | 2013 | Turn off equipment when not in use | $20,092 | - | |
| UD0888 #11 Y:2013 | 11 | 2013 | Utilize higher efficiency lamps and/or ballasts | $2,284 | $15,000 | |
| UD0888 #10 Y:2013 | 10 | 2013 | Reduce the pressure of compressed air to the minimum required | $695 | - | |
| UD0888 #09 Y:2013 | 09 | 2013 | Eliminate leaks in inert gas and compressed air lines/ valves | $8,246 | $3,000 | |
| UD0888 #08 Y:2013 | 08 | 2013 | Utilize controls to operate equipment only when needed | $2,313 | - | |
| UD0888 #07 Y:2013 | 07 | 2013 | Turn off equipment when not in use | $7,011 | - | |
| UD0888 #06 Y:2013 | 06 | 2013 | Use / purchase optimum sized compressor | $74,025 | $55,000 | |
| UD0888 #05 Y:2013 | 05 | 2013 | Eliminate or reduce compressed air usage | $5,528 | - | |
| UD0888 #04 Y:2013 | 04 | 2013 | Eliminate or reduce compressed air usage | $3,510 | $5,000 | |
| UD0888 #03 Y:2013 | 03 | 2013 | Install motor voltage controller on lightly loaded motors | $23,080 | $10,000 | |
| UD0888 #02 Y:2013 | 02 | 2013 | Utilize energy-efficient belts and other improved mechanisms | $841 | - |