ITAC Assessment: UL2611
ITAC logo
ITAC Assessment: UL2611
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Aluminum Powder
NAICS 331314: Secondary Smelting and Alloying of Aluminum
SIC 3341: Secondary Smelting and Refining of Nonferrous Metals
Sales Range $10
M
to 50
M
# of Employees 69
Plant Area 274,429
ft2
Annual Production 12,618,810
lb
Production Hrs. Annual 8,400
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $367,058 11,314,800
kWh
Electricity Demand $452,406 21,949
kW-mo/yr
Electricity Fees $23,476 -
Natural Gas $31,966 3,564
MMBtu
Other Energy $9,780 1
MMBtu
TOTAL YEARLY COSTS $884,686
RECOMMENDED SAVINGS* $61,407 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $8,768 $3,073 $4,685
144,603
kWh
$4,083
-
kW-mo/yr
-
02 2.7135: Install occupancy sensors $1,639 $4,686 $1,639
50,596
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,787 $3,450 $3,787
116,894
kWh
- -
04 2.2692: Use outside cold water source as a supply of cooling water $8,862 $43,234 $2,531
78,016
kWh
$6,331
-
kW-mo/yr
-
05 2.9114: Use solar heat to make electricty $20,448 $314,019 $9,252
285,209
kWh
$11,196
-
kW-mo/yr
-
06 2.2437: Recover waste heat from equipment $17,903 $50,000 - - $17,903
-
MMBtu
TOTAL RECOMMENDED $61,407 $418,462 $21,894
675,318
kWh
$21,610
-
kW-mo/yr
$17,903
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs