ITAC Assessment: TT0348
ITAC logo
ITAC Assessment: TT0348
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Aluminum Extruded Channels
NAICS 331318: Other Aluminum Rolling, Drawing, and Extruding
SIC 3354: Aluminum Extruded Products
Sales Range $100
M
to 500
M
# of Employees 575
Plant Area 400,000
ft2
Annual Production 70,000,000
lb
Production Hrs. Annual 8,148
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,744,165 37,692,388
kWh
Electricity Demand $1,011,324 149,078
kW-mo/yr
Electricity Fees $(-350,083.0) -
Natural Gas $1,907,791 563,517
MMBtu
Waste Disposal Costs
Water Usage $190,255 54,809
Tgal
Water Disposal $18,107 459
Tgal
TOTAL YEARLY COSTS $4,521,559
RECOMMENDED SAVINGS* $1,045,858 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $11,569 - $9,516
205,656
kWh
$2,053
-
kW-mo/yr
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $30,036 $9,265 $30,036
649,143
kWh
- - - -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $14,166 $6,100 $14,166
306,160
kWh
- - - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $131,043 $93,800 $131,043
2,832,138
kWh
- - - -
05 2.4224: Upgrade controls on compressors $77,487 $60,000 $63,733
1,377,414
kWh
$13,754
-
kW-mo/yr
- - -
06 4.612: Contract out maintenance $154,000 $120,000 - - - - $154,000
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,805 $5,000 $4,805
103,847
kWh
- - - -
08 2.2437: Recover waste heat from equipment $18,549 $35,000 - - - $18,549
-
MMBtu
-
09 3.7311: Maintain machines to reduce leaks $231,582 $444,791 - - - - $231,582
10 2.3212: Optimize plant power factor $60,117 $123,750 - - $60,117 - -
11 2.4239: Eliminate or reduce compressed air usage $19,435 $68,000 $15,985
345,650
kWh
$3,450
-
kW-mo/yr
- - -
12 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $229,980 $1,475,000 $189,300
4,092,000
kWh
$40,680
-
kW-mo/yr
- - -
13 2.9113: Use solar heat for heat $63,089 $729,585 $63,089
1,363,499
kWh
- - - -
TOTAL RECOMMENDED $1,045,858 $3,170,291 $521,672
11,275,505
kWh
$59,937
-
kW-mo/yr
$60,117 $18,549
-
MMBtu
$385,582
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs