Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

812

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Alumina and aluminum production and processing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
GT0993 #11 Y:2024 Use solar heat to make electricty $162,880 $1,659,784
GT0993 #10 Y:2024 Optimize plant power factor $6,294 $26,910
GT0993 #09 Y:2024 Turn off equipment during breaks, reduce operating time $89 $363
GT0993 #08 Y:2024 Install occupancy sensors $2,306 $2,763
GT0993 #07 Y:2024 Eliminate or reduce compressed air usage $643 $600
GT0993 #06 Y:2024 Repair faulty insulation in furnaces, boilers, etc $916 $788
GT0993 #05 Y:2024 Reduce space conditioning during non-working hours $1,717 $1,200
GT0993 #04 Y:2024 Reduce the pressure of compressed air to the minimum required $10,579 $600
GT0993 #03 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $38,254 $1,850
GT0993 #02 Y:2024 Reduce the pressure of compressed air to the minimum required $12,903 $200
GT0993 #01 Y:2024 Apply for tax-free status for energy purchases $27,885 $200
MI0455 #06 Y:2024 Install occupancy sensors $1,323 $1,578
MI0455 #05 Y:2024 Eliminate or reduce compressed air usage $5,478 $80
MI0455 #04 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $17,287 $1,620
MI0455 #03 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $20,861 $35,685
MI0455 #02 Y:2024 Change rate schedules or other changes in utility service $24,930 $3,200
MI0455 #01 Y:2024 Optimize plant power factor $46,100 $45,007
UL2417 #08 Y:2024 Install occupancy sensors $438 $941
UL2417 #07 Y:2024 Install spectral reflectors / delamp $900 -
UL2417 #06 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $1,025 $525