ITAC Assessment: UL2417
ITAC logo
ITAC Assessment: UL2417
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Aluminum wire
NAICS 331313: Alumina Refining and Primary Aluminum Production
SIC 3313: Electrometallurgical Products, Except Steel
Sales Range $50
M
to 100
M
# of Employees 46
Plant Area 150,000
ft2
Annual Production 10,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $51,475 1,514,000
kWh
Electricity Demand $96,576 4,237
kW-mo/yr
Electricity Fees $14,335 -
Natural Gas $119,833 18,565
MMBtu
Waste Disposal Costs
Water Usage $40,665 757
Tgal
TOTAL YEARLY COSTS $322,884
RECOMMENDED SAVINGS* $86,585 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings
01 2.9114: Use solar heat to make electricty $55,561 $524,124 $24,563
722,437
kWh
$30,998
-
kW-mo/yr
- -
02 2.2692: Use outside cold water source as a supply of cooling water $12,753 $43,234 $479
14,094
kWh
$1,530
-
kW-mo/yr
- $10,744
-
Tgal
03 2.2437: Recover waste heat from equipment $12,850 $39,000 - - $12,850
-
MMBtu
-
04 2.1121: Use insulation in furnaces to facilitate heating / cooling $2,595 $5,797 - - $2,595
-
MMBtu
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $463 - $463
13,622
kWh
- - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,025 $525 $1,025
30,161
kWh
- - -
07 2.7144: Install spectral reflectors / delamp $900 - $393
11,562
kWh
$507
-
kW-mo/yr
- -
08 2.7135: Install occupancy sensors $438 $941 $438
12,874
kWh
- - -
TOTAL RECOMMENDED $86,585 $613,621 $27,361
804,750
kWh
$33,035
-
kW-mo/yr
$15,445
-
MMBtu
$10,744
-
Tgal
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs