| Assessment Year | 2004 |
|---|---|
| Principal Product | PLASTIC PLUMBING FITTINGS |
| NAICS | 326122: Plastics Pipe and Pipe Fitting Manufacturing |
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 120 |
| Plant Area |
176,000
ft2
|
| Annual Production | 40,000,000
lb
|
| Production Hrs. Annual | 8,600
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $811,167 | 19,349,123 |
kWh
|
$0.042 |
| Natural Gas | $75 | - |
|
- |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $169,115 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $6,915 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.8114: Change rate schedules or other changes in utility service | $77 | - | - | - | $77 | |
| 02 | 2.3137: Use power during off-peak periods | $580 | $450 | - |
$580
-
kW-mo/yr
|
- | |
| 03 | 2.7122: Disconnect ballasts | $4,110 | $2,750 |
$2,647
90,500
kWh
|
$1,463
-
kW-mo/yr
|
- | |
| 04 | 2.5117: Convert to indirect temperature control system | $53,600 | $66,000 |
$33,295
1,110,000
kWh
|
$20,305
-
kW-mo/yr
|
- | |
| 05 | 2.4221: Install compressor air intakes in coolest locations | $740 | $1,000 |
$740
24,620
kWh
|
- | - | |
| 06 | 2.4224: Upgrade controls on compressors | $9,700 | $14,600 |
$9,700
321,960
kWh
|
- | - | |
| 07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $98,900 | $253,400 |
$64,359
2,146,000
kWh
|
$34,541
-
kW-mo/yr
|
- | |
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,408 | $7,300 |
$527
17,564
kWh
|
$881
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $169,115 | $345,500 |
$111,268
3,710,644
kWh
|
$57,770
-
kW-mo/yr
|
$77 | ||
| TOTAL IMPLEMENTED | $6,915 | $11,500 |
$3,914
132,684
kWh
|
$2,924
-
kW-mo/yr
|
$77 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs