ITAC Assessment: GT0781
ITAC logo
ITAC Assessment: GT0781
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product PLASTIC PLUMBING FITTINGS
NAICS 326122: Plastics Pipe and Pipe Fitting Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 176,000
ft2
Annual Production 40,000,000
lb
Production Hrs. Annual 8,600
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $811,167 19,349,123
kWh
Natural Gas $75 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $169,115 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,915

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.8114: Change rate schedules or other changes in utility service $77 - - - $77
02 2.3137: Use power during off-peak periods $580 $450 - $580
-
kW-mo/yr
-
03 2.7122: Disconnect ballasts $4,110 $2,750 $2,647
90,500
kWh
$1,463
-
kW-mo/yr
-
04 2.5117: Convert to indirect temperature control system $53,600 $66,000 $33,295
1,110,000
kWh
$20,305
-
kW-mo/yr
-
05 2.4221: Install compressor air intakes in coolest locations $740 $1,000 $740
24,620
kWh
- -
06 2.4224: Upgrade controls on compressors $9,700 $14,600 $9,700
321,960
kWh
- -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $98,900 $253,400 $64,359
2,146,000
kWh
$34,541
-
kW-mo/yr
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $1,408 $7,300 $527
17,564
kWh
$881
-
kW-mo/yr
-
TOTAL RECOMMENDED $169,115 $345,500 $111,268
3,710,644
kWh
$57,770
-
kW-mo/yr
$77
TOTAL IMPLEMENTED $6,915 $11,500 $3,914
132,684
kWh
$2,924
-
kW-mo/yr
$77
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings