ITAC Assessment: GT0993
ITAC logo
ITAC Assessment: GT0993
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Alumina Trihydrate & Magnesium Hydroxide
NAICS 331313: Alumina Refining and Primary Aluminum Production
SIC 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 100
Plant Area 150,000
ft2
Annual Production 106,473
ton
Production Hrs. Annual 8,760
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,422,707 21,734,260
kWh
Electricity Fees $34,179 -
Natural Gas $503,156 106,330
MMBtu
TOTAL YEARLY COSTS $1,960,042
RECOMMENDED SAVINGS* $264,466 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
01 2.8121: Apply for tax-free status for energy purchases $27,885 $200 - $27,885 - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $12,903 $200 $12,903
198,520
kWh
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $38,254 $1,850 $41,154
633,143
kWh
- - $(-2,900.0)
04 2.4231: Reduce the pressure of compressed air to the minimum required $10,579 $600 $10,579
162,749
kWh
- - -
05 2.7224: Reduce space conditioning during non-working hours $1,717 $1,200 $1,717
26,422
kWh
- - -
06 2.1131: Repair faulty insulation in furnaces, boilers, etc $916 $788 - - $916
-
MMBtu
-
07 2.4239: Eliminate or reduce compressed air usage $643 $600 $643
9,899
kWh
- - -
08 2.7135: Install occupancy sensors $2,306 $2,763 $2,306
35,484
kWh
- - -
09 2.6212: Turn off equipment during breaks, reduce operating time $89 $363 $89
1,370
kWh
- - -
10 2.3212: Optimize plant power factor $6,294 $26,910 - $6,294 - -
11 2.9114: Use solar heat to make electricty $162,880 $1,659,784 $162,880
2,511,604
kWh
- - -
TOTAL RECOMMENDED $264,466 $1,695,258 $232,271
3,579,191
kWh
$34,179 $916
-
MMBtu
$(-2,900.0)
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs