Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

142

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Mineral wool manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WV0362 #09 Y:2007 Establish a predictive maintenance program $1,851 $1,000
WV0362 #08 Y:2007 Develop a repair/replace policy $1,851 $185
WV0362 #07 Y:2007 Make a practice of turning off lights when not needed $1,693 $1,500
WV0362 #06 Y:2007 Utilize higher efficiency lamps and/or ballasts $1,787 -
WV0362 #05 Y:2007 Utilize energy-efficient belts and other improved mechanisms $3,397 -
WV0362 #04 Y:2007 Recover waste heat from equipment $3,748 $660
WV0362 #03 Y:2007 Analyze flue gas for proper air/fuel ratio $4,679 $2,000
WV0362 #02 Y:2007 Use waste heat from hot flue gases to preheat $10,461 $13,900
WV0362 #01 Y:2007 Insulate bare equipment $80,064 $26,135
AS0429 #04 Y:2006 Use optimum size and capacity equipment $34 $3,200
AS0429 #03 Y:2006 Reduce the pressure of compressed air to the minimum required $1,127 $1,000
AS0429 #02 Y:2006 Insulate bare equipment $2,039 $500
AS0429 #01 Y:2006 Analyze flue gas for proper air/fuel ratio $2,688 $1,000
AS0428 #08 Y:2006 Use optimum size and capacity equipment $475 $4,000
AS0428 #07 Y:2006 Insulate bare equipment $614 $300
AS0428 #06 Y:2006 Eliminate leaks in inert gas and compressed air lines/ valves $1,348 $5,000
AS0428 #05 Y:2006 Eliminate or reduce compressed air usage $2,252 $1,500
AS0428 #04 Y:2006 Use or replace with energy efficient substitutes $2,269 $5,600
AS0428 #03 Y:2006 Eliminate or reduce compressed air usage $2,918 $2,500
AS0428 #02 Y:2006 Analyze flue gas for proper air/fuel ratio $3,791 $1,000