ITAC Assessment: MS0332
ITAC logo
ITAC Assessment: MS0332
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Ceiling Tile
NAICS 327993: Mineral Wool Manufacturing
SIC 3296: Mineral Wool
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 420,000
ft2
Annual Production 120,000
thousand feet
Production Hrs. Annual 5,880
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $263,479 15,808,800
kWh
Electricity Demand $217,403 40,636
kW-mo/yr
Electricity Fees $745,957 -
Natural Gas $4,368,311 477,532
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,186,340 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $827,627

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $771,322 $1,000 - - - $771,322
-
MMBtu
02 2.2414: Use waste heat from hot flue gases to preheat $358,713 $96,000 - - - $358,713
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $29,875 $65,823 $23,712
434,303
kWh
$4,740
-
kW-mo/yr
$1,423 -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $11,591 $401 $11,039
202,183
kWh
- $552 -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $14,696 $6,360 $10,498
192,270
kWh
$3,499
-
kW-mo/yr
$699 -
06 2.2515: Use optimum thickness insulation $143 $108 - - - $143
-
MMBtu
TOTAL RECOMMENDED $1,186,340 $169,692 $45,249
828,756
kWh
$8,239
-
kW-mo/yr
$2,674 $1,130,178
-
MMBtu
TOTAL IMPLEMENTED $827,627 $73,692 $45,249
828,756
kWh
$8,239
-
kW-mo/yr
$2,674 $771,465
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs