ITAC Assessment: TN0232
ITAC logo
ITAC Assessment: TN0232
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product CASUAL HOSIERY
NAICS
n/a
SIC 2252: Hosiery, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area
n/a
Annual Production 26,000,000
pieces
Production Hrs. Annual 7,200
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $117,537 2,356,975
kWh
Natural Gas $163,210 30,590
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $71,365 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $51,821

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2136: Install / repair insulation on steam lines $31,111 $4,573 - $31,111
-
MMBtu
02 2.2441: Preheat boiler makeup water with waste process heat $11,721 $18,050 - $11,721
-
MMBtu
03 2.7111: Reduce illumination to minimum necessary levels $14,298 - $14,298
286,635
kWh
-
04 2.2514: Cover open tanks $5,089 $2,750 - $5,089
-
MMBtu
05 2.2135: Repair and eliminate steam leaks $3,742 $140 - $3,742
-
MMBtu
06 2.2511: Insulate bare equipment $2,734 $855 - $2,734
-
MMBtu
07 2.2122: Install / repair insulation on condensate lines $2,670 $462 - $2,670
-
MMBtu
TOTAL RECOMMENDED $71,365 $26,830 $14,298
286,635
kWh
$57,067
-
MMBtu
TOTAL IMPLEMENTED $51,821 $5,175 $14,298
286,635
kWh
$37,523
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs