Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Candy
NAICS
n/a
SIC 2064: Candy and Other Confectionery Products
Sales Range $1
M
to 5
M
# of Employees 30
Plant Area 38,000
ft2
Annual Production 2,500,000
lb
Production Hrs. Annual 2,340
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $17,905 222,743
kWh
Electricity Demand $4,313 1,045
kW-mo/yr
Natural Gas $40,160 6,640
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,502 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,504

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.2135: Repair and eliminate steam leaks $3,822 $600 - - $3,822
-
MMBtu
- -
02 2.2136: Install / repair insulation on steam lines $565 $560 - - $565
-
MMBtu
- -
03 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $563 $575 $563
5,862
kWh
- - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $713 $4,745 $139
26,964
kWh
$574
-
kW-mo/yr
- - -
05 2.4133: Use most efficient type of electric motors $182 $513 $144
1,758
kWh
$38
-
kW-mo/yr
- - -
06 2.7135: Install occupancy sensors $336 $1,456 $266
3,224
kWh
$70
-
kW-mo/yr
- - -
07 3.5316: Contract a wood pallet recycling company $862 - - - - $862
-
lb
-
08 3.5313: Increase amount of waste recovered for resale $360 $115 - - - $360
-
lb
-
09 4.652: Replace existing equipment with more suitable substitutes $3,099 $3,615 - - - - $3,099
TOTAL RECOMMENDED $10,502 $12,179 $1,112
37,808
kWh
$682
-
kW-mo/yr
$4,387
-
MMBtu
$1,222
-
lb
$3,099
TOTAL IMPLEMENTED $6,504 $6,533 $283
28,722
kWh
$612
-
kW-mo/yr
$4,387
-
MMBtu
$1,222
-
lb
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs