ITAC Assessment: OK0694
ITAC logo
ITAC Assessment: OK0694
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Elemental Iodine
NAICS 325199: All Other Basic Organic Chemical Manufacturing
SIC 2864:
Sales Range $10
M
to 50
M
# of Employees 30
Plant Area 803,000
ft2
Annual Production 4,200
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,413,850 43,851,840
kWh
Electricity Demand $346,646 66,633
kW-mo/yr
Electricity Fees $7,644 -
LPG $98,199 8,116
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,183,091 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,404

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Ancillary Material Cost Savings Increase in Production Savings
01 2.2437: Recover waste heat from equipment $1,045,517 $1,029,484 $(-3,667.0)
(-79,716)
kWh
$(-816.0)
-
kW-mo/yr
- - - $1,050,000
02 2.1331: Burn a less expensive grade of fuel $60,059 $691 - - $(-38,145.0)
-
MMBtu
$98,204
-
MMBtu
- -
03 2.2444: Use hot process fluids to preheat incoming process fluids $9,026 $9,344 $6,241
193,833
kWh
$2,785
-
kW-mo/yr
- - - -
04 2.4133: Use most efficient type of electric motors $65,085 $407,420 $53,269
1,654,330
kWh
$11,816
-
kW-mo/yr
- - - -
05 2.2511: Insulate bare equipment $2,247 $2,094 - - - $2,247
-
MMBtu
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,157 $2,968 $554
17,192
kWh
$368
-
kW-mo/yr
- - $235 -
TOTAL RECOMMENDED $1,183,091 $1,452,001 $56,397
1,785,639
kWh
$14,153
-
kW-mo/yr
$(-38,145.0)
-
MMBtu
$100,451
-
MMBtu
$235 $1,050,000
TOTAL IMPLEMENTED $3,404 $5,062 $554
17,192
kWh
$368
-
kW-mo/yr
- $2,247
-
MMBtu
$235 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Ancillary Material Cost Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs