514
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| LE0435 #04 Y:2017 | 04 | 2017 | Re-use or recycle hot or cold process exhaust air | $18,948 | $76,000 | |
| LE0435 #03 Y:2017 | 03 | 2017 | Replace existing hvac unit with high efficiency model | $1,249 | $3,100 | |
| LE0435 #02 Y:2017 | 02 | 2017 | Eliminate leaks in inert gas and compressed air lines/ valves | $3,469 | $1,000 | |
| LE0435 #01 Y:2017 | 01 | 2017 | Reduce the pressure of compressed air to the minimum required | $1,125 | $20 | |
| TT0182 #10 Y:2016 | 10 | 2016 | Eliminate leaks in inert gas and compressed air lines/ valves | $836 | $600 | |
| TT0182 #09 Y:2016 | 09 | 2016 | Install timers and/or thermostats | $1,612 | $500 | |
| TT0182 #08 Y:2016 | 08 | 2016 | Eliminate or reduce compressed air usage | $1,822 | $1,500 | |
| TT0182 #07 Y:2016 | 07 | 2016 | Utilize energy-efficient belts and other improved mechanisms | $1,896 | $3,000 | |
| TT0182 #06 Y:2016 | 06 | 2016 | Upgrade controls on compressors | $6,416 | $19,000 | |
| TT0182 #05 Y:2016 | 05 | 2016 | Reduce the pressure of compressed air to the minimum required | $6,956 | $5,000 | |
| TT0182 #04 Y:2016 | 04 | 2016 | Use or replace with energy efficient substitutes | $9,314 | $4,000 | |
| TT0182 #03 Y:2016 | 03 | 2016 | Utilize higher efficiency lamps and/or ballasts | $11,055 | $53,270 | |
| TT0182 #02 Y:2016 | 02 | 2016 | Insulate bare equipment | $12,836 | $61,050 | |
| TT0182 #01 Y:2016 | 01 | 2016 | Insulate bare equipment | $13,618 | $20,200 | |
| UK1604 #10 Y:2016 | 10 | 2016 | Recover waste heat from equipment | $2,729 | $6,000 | |
| UK1604 #09 Y:2016 | 09 | 2016 | Eliminate leaks in inert gas and compressed air lines/ valves | $4,645 | $1,200 | |
| UK1604 #08 Y:2016 | 08 | 2016 | Install / repair insulation on steam lines | $56 | $61 | |
| UK1604 #07 Y:2016 | 07 | 2016 | Recover waste heat from equipment | $1,094 | $5,000 | |
| UK1604 #06 Y:2016 | 06 | 2016 | Recycle air for heating, ventilation and air conditioning | $2,304 | $3,620 | |
| UK1604 #05 Y:2016 | 05 | 2016 | Analyze flue gas for proper air/fuel ratio | $7,018 | $3,500 |