ITAC Assessment: UK1604
ITAC logo
ITAC Assessment: UK1604
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Abrasive cut-off wheels
NAICS 327910: Abrasive Product Manufacturing
SIC 3291: Abrasive Products
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area 130,000
ft2
Annual Production 600,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $121,089 3,375,360
kWh
Electricity Demand $133,972 7,737
kW-mo/yr
Electricity Fees $30,889 -
Natural Gas $63,819 10,010
MMBtu
TOTAL YEARLY COSTS $349,769
RECOMMENDED SAVINGS* $62,340 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $25,375

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings
01 2.3212: Optimize plant power factor $14,750 $8,715 - - $14,750 - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $29,425 $67,500 $12,299
342,601
kWh
$17,126
-
kW-mo/yr
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $166 $196 $70
1,962
kWh
$46
-
kW-mo/yr
- - $50
04 2.7135: Install occupancy sensors $153 $280 $153
4,253
kWh
- - - -
05 2.1233: Analyze flue gas for proper air/fuel ratio $7,018 $3,500 - - - $7,018
-
MMBtu
-
06 2.7313: Recycle air for heating, ventilation and air conditioning $2,304 $3,620 $(-118.0)
(-3,287)
kWh
$(-77.5)
-
kW-mo/yr
- - $2,500
07 2.2437: Recover waste heat from equipment $1,094 $5,000 $(-60.0)
(-1,660)
kWh
$(-90.0)
-
kW-mo/yr
- $1,244
-
MMBtu
-
08 2.2136: Install / repair insulation on steam lines $56 $61 - - - $56
-
MMBtu
-
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,645 $1,200 $4,645
129,376
kWh
- - - -
10 2.2437: Recover waste heat from equipment $2,729 $6,000 - - - $2,729
-
MMBtu
-
TOTAL RECOMMENDED $62,340 $96,072 $16,989
473,245
kWh
$17,004
-
kW-mo/yr
$14,750 $11,047
-
MMBtu
$2,550
TOTAL IMPLEMENTED $25,375 $21,176 $(-25.0)
(-694)
kWh
$(-167.5)
-
kW-mo/yr
$14,750 $8,318
-
MMBtu
$2,500
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs