Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

474

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Other nonmetallic mineral product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SF0367 #11 Y:2008 Utilize controls to operate equipment only when needed $14,022 $18,000
SF0367 #10 Y:2008 Use adjustable frequency drive or multiple speed motors on existing system $7,802 $10,433
SF0367 #09 Y:2008 Utilize controls to operate equipment only when needed $11,030 $7,537
SF0367 #08 Y:2008 Use adjustable frequency drive or multiple speed motors on existing system $21,234 $9,745
SF0367 #07 Y:2008 Install occupancy sensors $9,914 $1,497
SF0367 #06 Y:2008 Utilize controls to operate equipment only when needed $14,633 $1,078
SF0367 #05 Y:2008 Install timers and/or thermostats $1,679 $143
SF0367 #04 Y:2008 Turn off equipment when not in use $360 -
SF0367 #03 Y:2008 Use optimum size and capacity equipment $16,340 $5,460
SF0367 #02 Y:2008 Use optimum size and capacity equipment $121,210 $720
SF0367 #01 Y:2008 Use optimum size and capacity equipment $169,502 $10,920
MS0332 #06 Y:2008 Use optimum thickness insulation $143 $108
MS0332 #05 Y:2008 Utilize energy-efficient belts and other improved mechanisms $14,696 $6,360
MS0332 #04 Y:2008 Eliminate leaks in inert gas and compressed air lines/ valves $11,591 $401
MS0332 #03 Y:2008 Utilize higher efficiency lamps and/or ballasts $29,875 $65,823
MS0332 #02 Y:2008 Use waste heat from hot flue gases to preheat $358,713 $96,000
MS0332 #01 Y:2008 Analyze flue gas for proper air/fuel ratio $771,322 $1,000
UD0777 #15 Y:2007 Modify process to reduce material use/cost $1,436 -
UD0777 #14 Y:2007 Utilize higher efficiency lamps and/or ballasts $2,509 $3,815
UD0777 #13 Y:2007 Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $4,240 -