Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

188

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Other pressed and blown glass and glassware manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SD0641 #12 Y:2023 Use more efficient adhesive applicators $80,045 $6,600
SD0641 #11 Y:2023 Insulate bare equipment $347 $332
SD0641 #10 Y:2023 Replace existing hvac unit with high efficiency model $2,049 $6,650
SD0641 #09 Y:2023 Adjust burners for efficient operation $3,019 $7,800
SD0641 #08 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $628 $1,441
SD0641 #07 Y:2023 Use solar heat to make electricty $46,189 $70,634
SD0641 #06 Y:2023 Insulate bare equipment $252 $1,171
SD0641 #05 Y:2023 Replace electrically-operated equipment with fossil fuel equipment $2,325 $8,632
SD0641 #04 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $3,929 $16,830
SD0641 #03 Y:2023 Install direct acting units in place of compressed air pressure system in safety system $2,501 $11,000
SD0641 #02 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $5,834 $21,620
SD0641 #01 Y:2023 Utilize higher efficiency lamps and/or ballasts $6,553 $19,352
WV0612 #11 Y:2021 Install set-back timers $611 $1,110
WV0612 #10 Y:2021 Reduce temperature of process equipment when on standby $701 $397
WV0612 #09 Y:2021 Replace fossil fuel equipment with electrical equipment $1,090 $1,341
WV0612 #08 Y:2021 Replace obsolete burners with more efficient ones $1,683 $8,044
WV0612 #07 Y:2021 Utilize higher efficiency lamps and/or ballasts $3,008 $8,132
WV0612 #06 Y:2021 Install vinyl strip / high speed / air curtain doors $3,641 $4,320
WV0612 #05 Y:2021 Use adjustable frequency drive or multiple speed motors on existing system $4,798 $7,637
WV0612 #04 Y:2021 Re-size charging openings or add a movable door on equipment $13,924 $27,550