194
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | Other pressed and blown glass and glassware manufacturing | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| WV0703 #06 Y:2026 | 06 | 2026 | Utilize higher efficiency lamps and/or ballasts | $520 | $1,456 |
n/a
|
| WV0703 #05 Y:2026 | 05 | 2026 | Use waste heat from hot flue gases to preheat | $1,009 | $3,255 |
n/a
|
| WV0703 #04 Y:2026 | 04 | 2026 | Utilize higher efficiency lamps and/or ballasts | $1,104 | $1,600 |
n/a
|
| WV0703 #03 Y:2026 | 03 | 2026 | Analyze flue gas for proper air/fuel ratio | $2,222 | $2,159 |
n/a
|
| WV0703 #02 Y:2026 | 02 | 2026 | Insulate bare equipment | $2,406 | $972 |
n/a
|
| WV0703 #01 Y:2026 | 01 | 2026 | Analyze flue gas for proper air/fuel ratio | $5,151 | $3,159 |
n/a
|
| SD0641 #12 Y:2023 | 12 | 2023 | Use more efficient adhesive applicators | $80,045 | $6,600 | |
| SD0641 #11 Y:2023 | 11 | 2023 | Insulate bare equipment | $347 | $332 | |
| SD0641 #10 Y:2023 | 10 | 2023 | Replace existing hvac unit with high efficiency model | $2,049 | $6,650 | |
| SD0641 #09 Y:2023 | 09 | 2023 | Adjust burners for efficient operation | $3,019 | $7,800 | |
| SD0641 #08 Y:2023 | 08 | 2023 | Eliminate leaks in inert gas and compressed air lines/ valves | $628 | $1,441 | |
| SD0641 #07 Y:2023 | 07 | 2023 | Use solar heat to make electricty | $46,189 | $70,634 | |
| SD0641 #06 Y:2023 | 06 | 2023 | Insulate bare equipment | $252 | $1,171 | |
| SD0641 #05 Y:2023 | 05 | 2023 | Replace electrically-operated equipment with fossil fuel equipment | $2,325 | $8,632 | |
| SD0641 #04 Y:2023 | 04 | 2023 | Use adjustable frequency drive or multiple speed motors on existing system | $3,929 | $16,830 | |
| SD0641 #03 Y:2023 | 03 | 2023 | Install direct acting units in place of compressed air pressure system in safety system | $2,501 | $11,000 | |
| SD0641 #02 Y:2023 | 02 | 2023 | Use adjustable frequency drive or multiple speed motors on existing system | $5,834 | $21,620 | |
| SD0641 #01 Y:2023 | 01 | 2023 | Utilize higher efficiency lamps and/or ballasts | $6,553 | $19,352 | |
| WV0612 #11 Y:2021 | 11 | 2021 | Install set-back timers | $611 | $1,110 | |
| WV0612 #10 Y:2021 | 10 | 2021 | Reduce temperature of process equipment when on standby | $701 | $397 |