ITAC Assessment: SD0641
ITAC logo
ITAC Assessment: SD0641
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Fiberglass Bus and Train Components
NAICS 327212: Other Pressed and Blown Glass and Glassware Manufacturing
SIC 3229: Pressed and Blown Glass and Glassware, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 105
Plant Area 55,000
ft2
Annual Production 500,000
units
Production Hrs. Annual 2,160
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $55,775 520,805
kWh
Electricity Demand $70,314 3,117
kW-mo/yr
Electricity Fees $6,152 -
Natural Gas $36,746 1,607
MMBtu
Waste Disposal Costs
Other Liquid (haz) $346,680 3,240
gal
TOTAL YEARLY COSTS $515,667
RECOMMENDED SAVINGS* $153,671 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $46,189

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Liquid (haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,553 $19,352 $2,985
27,873
kWh
$3,497
-
kW-mo/yr
$71 - -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,834 $21,620 $2,184
20,394
kWh
$3,650
-
kW-mo/yr
- - -
03 2.4223: Install direct acting units in place of compressed air pressure system in safety system $2,501 $11,000 $2,501
23,348
kWh
- - - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,929 $16,830 $1,708
15,952
kWh
$2,221
-
kW-mo/yr
- - -
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $2,325 $8,632 $772
7,203
kWh
$2,256
-
kW-mo/yr
- $(-702.5)
-
MMBtu
-
06 2.2511: Insulate bare equipment $252 $1,171 $75
705
kWh
$177
-
kW-mo/yr
- - -
07 2.9114: Use solar heat to make electricty $46,189 $70,634 $19,117
178,500
kWh
$27,072
-
kW-mo/yr
- - -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $628 $1,441 $291
2,718
kWh
$337
-
kW-mo/yr
- - -
09 2.1133: Adjust burners for efficient operation $3,019 $7,800 - - - $3,019
-
MMBtu
-
10 2.7232: Replace existing hvac unit with high efficiency model $2,049 $6,650 $760
7,095
kWh
$1,289
-
kW-mo/yr
- - -
11 2.2511: Insulate bare equipment $347 $332 $65
609
kWh
$282
-
kW-mo/yr
- - -
12 3.1121: Use more efficient adhesive applicators $80,045 $6,600 - - - - $80,045
-
gal
TOTAL RECOMMENDED $153,671 $172,062 $30,458
284,397
kWh
$40,781
-
kW-mo/yr
$71 $2,317
-
MMBtu
$80,045
-
gal
TOTAL IMPLEMENTED $46,189 $70,634 $19,117
178,500
kWh
$27,072
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Liquid (haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs