23
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| OR0818 #03 Y:2025 | 03 | 2025 | Use solar heat to make electricty | $29,217 | $421,610 | |
| OR0818 #02 Y:2025 | 02 | 2025 | Reduce the pressure of compressed air to the minimum required | $1,920 | - | |
| OR0818 #01 Y:2025 | 01 | 2025 | Eliminate or reduce compressed air usage | $7,742 | - | |
| UW0028 #08 Y:2009 | 08 | 2009 | Reduce the pressure of compressed air to the minimum required | $144 | - | |
| UW0028 #07 Y:2009 | 07 | 2009 | Utilize energy-efficient belts and other improved mechanisms | $847 | $560 | |
| UW0028 #06 Y:2009 | 06 | 2009 | Meter waste water | $1,060 | $12,000 | |
| UW0028 #05 Y:2009 | 05 | 2009 | Use most efficient type of electric motors | $10,663 | $31,539 | |
| UW0028 #04 Y:2009 | 04 | 2009 | Install occupancy sensors | $12,524 | $1,960 | |
| UW0028 #03 Y:2009 | 03 | 2009 | Utilize higher efficiency lamps and/or ballasts | $16,942 | $76,700 | |
| UW0028 #02 Y:2009 | 02 | 2009 | Preheat combustion air with waste heat | $323,442 | $485,164 | |
| UW0028 #01 Y:2009 | 01 | 2009 | Preheat combustion air with waste heat | $1,467,516 | $2,201,270 | |
| OR0531 #05 Y:2008 | 05 | 2008 | Size electric motors for peak operating efficiency | $32,266 | $3,000 | |
| OR0531 #04 Y:2008 | 04 | 2008 | Clear and rent existing space | $24,000 | - | |
| OR0531 #03 Y:2008 | 03 | 2008 | Treat and reuse equipment cleaning solutions | $2,400 | - | |
| OR0531 #02 Y:2008 | 02 | 2008 | Optimize plant power factor | $20,000 | $87,500 | |
| OR0531 #01 Y:2008 | 01 | 2008 | Install occupancy sensors | $2,818 | $2,800 | |
| UW0002 #07 Y:2007 | 07 | 2007 | Install occupancy sensors | $153 | $200 | |
| UW0002 #06 Y:2007 | 06 | 2007 | Use most efficient type of electric motors | $906 | $653 | |
| UW0002 #05 Y:2007 | 05 | 2007 | Eliminate leaks in inert gas and compressed air lines/ valves | $700 | $252 | |
| UW0002 #04 Y:2007 | 04 | 2007 | Insulate bare equipment | $5,998 | $2,692 |