Assessment Year | 2009 |
---|---|
Principal Product | Wine Bottles |
NAICS | 327213: Glass Container Manufacturing |
SIC | 3221: Glass Containers |
Sales Range | $100 M to 500M |
# of Employees | 650 |
Plant Area |
500,000
ft2
|
Annual Production | 500,000,000
units
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Washington |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $5,125,118 | 113,967,235 |
kWh
|
$0.045 |
Electricity Demand | $6,570 | 13,010 |
kW-mo/yr
|
$0.50 |
Natural Gas | $10,890,883 | 1,184,770 |
MMBtu
|
$9.19 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $1,833,138 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $30,670 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2442: Preheat combustion air with waste heat | $1,467,516 | $2,201,270 |
$303,124
6,811,776
kWh
|
- |
$1,164,392
-
MMBtu
|
- | |
02 | 2.2442: Preheat combustion air with waste heat | $323,442 | $485,164 | - | - |
$323,442
-
MMBtu
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $16,942 | $76,700 |
$14,250
320,227
kWh
|
$2,692
-
kW-mo/yr
|
- | - | |
04 | 2.7135: Install occupancy sensors | $12,524 | $1,960 |
$12,524
271,441
kWh
|
- | - | - | |
05 | 2.4133: Use most efficient type of electric motors | $10,663 | $31,539 |
$9,303
188,361
kWh
|
$1,360
-
kW-mo/yr
|
- | - | |
06 | 3.4155: Meter waste water | $1,060 | $12,000 | - | - | - |
$1,060
-
Tgal
|
|
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $847 | $560 |
$834
18,746
kWh
|
$13
-
kW-mo/yr
|
- | - | |
08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $144 | - |
$144
2,453
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $1,833,138 | $2,809,193 |
$340,179
7,613,004
kWh
|
$4,065
-
kW-mo/yr
|
$1,487,834
-
MMBtu
|
$1,060
-
Tgal
|
||
TOTAL IMPLEMENTED | $30,670 | $90,660 |
$26,918
594,121
kWh
|
$2,692
-
kW-mo/yr
|
- |
$1,060
-
Tgal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs