Assessment Year | 2007 |
---|---|
Principal Product | Tempered glass panes and insulated glass panes |
NAICS | 327215: Glass Product Manufacturing Made of Purchased Glass |
SIC | 3231: Glass Products, Made of Purchased Glass |
Sales Range | $10 M to 50M |
# of Employees | 90 |
Plant Area |
64,000
ft2
|
Annual Production | 800,000
pieces
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | Washington |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $275,656 | 8,142,000 |
kWh
|
$0.034 |
Electricity Demand | $121,971 | 20,569 |
kW-mo/yr
|
$5.93 |
Electricity Fees | $10,893 | - |
|
- |
Other Gas | $5,000 | 1,000 |
MMBtu
|
$5.00 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $47,913 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $14,851 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $21,263 | $85,000 |
$21,263
628,054
kWh
|
- | - | - | |
02 | 2.3212: Optimize plant power factor | $10,893 | $16,323 | - |
$10,893
-
kW-mo/yr
|
- | - | |
03 | 2.2437: Recover waste heat from equipment | $8,000 | $9,385 | - | - |
$5,000
-
MMBtu
|
$3,000 | |
04 | 2.2511: Insulate bare equipment | $5,998 | $2,692 |
$5,998
177,158
kWh
|
- | - | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $700 | $252 |
$820
24,216
kWh
|
- | - | $(-120.0) | |
06 | 2.4133: Use most efficient type of electric motors | $906 | $653 |
$633
18,705
kWh
|
$273
-
kW-mo/yr
|
- | - | |
07 | 2.7135: Install occupancy sensors | $153 | $200 |
$153
4,524
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $47,913 | $114,505 |
$28,867
852,657
kWh
|
$11,166
-
kW-mo/yr
|
$5,000
-
MMBtu
|
$2,880 | ||
TOTAL IMPLEMENTED | $14,851 | $12,529 |
$6,971
205,898
kWh
|
- |
$5,000
-
MMBtu
|
$2,880 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs