36
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| OK0771 #01 Y:2008 | 01 | 2008 | Install / repair insulation on steam lines | $12,463 | $846 | |
| OK0769 #07 Y:2008 | 07 | 2008 | Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat | $451,827 | $2,500,000 | |
| OK0769 #06 Y:2008 | 06 | 2008 | Begin a practice of predictive / preventative maintenance | $2,068 | $200 | |
| OK0769 #05 Y:2008 | 05 | 2008 | Use adjustable frequency drive or multiple speed motors on existing system | $21,911 | $4,475 | |
| OK0769 #04 Y:2008 | 04 | 2008 | Utilize higher efficiency lamps and/or ballasts | $98,641 | $246,228 | |
| OK0769 #03 Y:2008 | 03 | 2008 | Utilize higher efficiency lamps and/or ballasts | $788 | $1,922 | |
| OK0769 #02 Y:2008 | 02 | 2008 | Install / repair insulation on steam lines | $18,368 | $731 | |
| OK0769 #01 Y:2008 | 01 | 2008 | Install / repair insulation on steam lines | $53,558 | $2,347 | |
| OK0711 #08 Y:2005 | 08 | 2005 | Utilize higher efficiency lamps and/or ballasts | $603 | $4,626 | |
| OK0711 #07 Y:2005 | 07 | 2005 | Use demand controller or load shedder | $215,784 | $8,400 | |
| OK0711 #06 Y:2005 | 06 | 2005 | Install occupancy sensors | $846 | $811 | |
| OK0711 #05 Y:2005 | 05 | 2005 | Begin a practice of predictive / preventative maintenance | $8,800 | - | |
| OK0711 #04 Y:2005 | 04 | 2005 | Chill water to the highest temperature possible | $13,929 | $125 | |
| OK0711 #03 Y:2005 | 03 | 2005 | Reduce the pressure of compressed air to the minimum required | $1,907 | $3,150 | |
| OK0711 #02 Y:2005 | 02 | 2005 | Eliminate leaks in inert gas and compressed air lines/ valves | $333 | $647 | |
| OK0711 #01 Y:2005 | 01 | 2005 | Use adjustable frequency drive or multiple speed motors on existing system | $10,068 | $25,248 |