| Assessment Year | 2005 |
|---|---|
| Principal Product | Polyethylene Stretch Film |
| NAICS | 327212: Other Pressed and Blown Glass and Glassware Manufacturing |
| SIC | 3085: Plastics Bottles |
| Sales Range | $50 M to 100M |
| # of Employees | 80 |
| Plant Area |
113,000
ft2
|
| Annual Production | 76,834,000
thousand feet
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $451,778 | - |
|
- |
| Electricity Demand | $45,354 | - |
|
- |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $252,270 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $10,068 | $25,248 |
$10,068
267,778
kWh
|
- | - | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $333 | $647 |
$189
10,080
kWh
|
$144
-
kW-mo/yr
|
- | |
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,907 | $3,150 |
$1,102
58,815
kWh
|
$805
-
kW-mo/yr
|
- | |
| 04 | 2.2625: Chill water to the highest temperature possible | $13,929 | $125 |
$8,055
430,041
kWh
|
$5,874
-
kW-mo/yr
|
- | |
| 05 | 4.611: Begin a practice of predictive / preventative maintenance | $8,800 | - | - | - | $8,800 | |
| 06 | 2.7135: Install occupancy sensors | $846 | $811 |
$846
45,178
kWh
|
- | - | |
| 07 | 2.3191: Use demand controller or load shedder | $215,784 | $8,400 | - |
$215,784
-
kW-mo/yr
|
- | |
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $603 | $4,626 |
$277
14,764
kWh
|
$376
-
kW-mo/yr
|
$(-50.4) | |
| TOTAL RECOMMENDED | $252,270 | $43,007 |
$20,537
826,656
kWh
|
$222,983
-
kW-mo/yr
|
$8,750 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs