ITAC Assessment: IA0026
ITAC logo
ITAC Assessment: IA0026
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product PIZZA TOPPINGS
NAICS
n/a
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area
n/a
Annual Production 21,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $141,074 2,591,442
kWh
Natural Gas $134,666 32,058
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,802 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,217

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2425: Use flue gases to heat process or service water $7,666 $15 - $7,666
-
MMBtu
-
02 2.2437: Recover waste heat from equipment $486 $714 - $486
-
MMBtu
-
03 2.1131: Repair faulty insulation in furnaces, boilers, etc $1,634 $496 - $1,634
-
MMBtu
-
04 2.4133: Use most efficient type of electric motors $736 $4,500 $736
13,189
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,465 $779 $3,277
59,203
kWh
- $(-812.0)
06 2.6232: Install set-back timers $815 $1,080 $815
14,654
kWh
- -
TOTAL RECOMMENDED $13,802 $7,584 $4,828
87,046
kWh
$9,786
-
MMBtu
$(-812.0)
TOTAL IMPLEMENTED $9,217 $5,595 $1,551
27,843
kWh
$7,666
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs