ITAC Assessment: OK0771
ITAC logo
ITAC Assessment: OK0771
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Flat annealed tempered glass
NAICS 327215: Glass Product Manufacturing Made of Purchased Glass
SIC 3231: Glass Products, Made of Purchased Glass
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 150,000
ft2
Annual Production 12,000
thousand feet
Production Hrs. Annual 6,240
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $598,202 9,664,699
kWh
Natural Gas $12,279 1,043
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,465 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.2136: Install / repair insulation on steam lines $12,463 $846 $12,463
201,348
kWh
02 2.4221: Install compressor air intakes in coolest locations $3,125 $3,460 $3,125
50,482
kWh
03 2.4231: Reduce the pressure of compressed air to the minimum required $3,458 - $3,458
55,861
kWh
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,066 - $6,066
106,695
kWh
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,001 $2,875 $1,001
10,184
kWh
06 2.7135: Install occupancy sensors $284 $1,213 $284
4,583
kWh
07 4.611: Begin a practice of predictive / preventative maintenance $2,068 $200 $2,068
-
kWh
TOTAL RECOMMENDED $28,465 $8,594 $28,465
429,153
kWh
TOTAL IMPLEMENTED - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs