ITAC Assessment: UK1910
ITAC logo
ITAC Assessment: UK1910
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Printing, Finishing, Mailing, Fulfillment and Freight
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2752: Commercial Printing, Lithographic
Sales Range $10
M
to 50
M
# of Employees 105
Plant Area 144,000
ft2
Annual Production 162,397,341
pieces
Production Hrs. Annual 6,552
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $188,907 4,840,800
kWh
Electricity Demand $199,493 12,309
kW-mo/yr
Electricity Fees $(-2,509.0) -
Natural Gas $15,070 807
MMBtu
TOTAL YEARLY COSTS $400,961
RECOMMENDED SAVINGS* $104,736 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $104,736

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $7,415 $2,477 $5,664
145,222
kWh
$1,751
-
kW-mo/yr
- -
02 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $510 $1,775 $510
13,087
kWh
- - -
03 2.2511: Insulate bare equipment $280 $161 $280
7,186
kWh
- - -
04 2.7442: Keep doors and windows shut when not on use $4,283 - $4,283
109,828
kWh
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $65,342 $110,141 $42,551
1,091,059
kWh
$22,791
-
kW-mo/yr
- -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $569 $300 $355
9,094
kWh
$214
-
kW-mo/yr
- -
07 2.4133: Use most efficient type of electric motors $838 $350 $520
13,333
kWh
$318
-
kW-mo/yr
- -
08 2.4323: Use optimum size and capacity equipment $1,365 $3,625 $830
21,289
kWh
$535
-
kW-mo/yr
- -
09 2.5123: Reduce fluid flow rates $1,484 $1,900 $706
18,101
kWh
$778
-
kW-mo/yr
- -
10 2.2442: Preheat combustion air with waste heat $1,344 $2,838 - - - $1,344
-
MMBtu
11 2.1233: Analyze flue gas for proper air/fuel ratio $1,251 $1,000 - - - $1,251
-
MMBtu
12 2.3212: Optimize plant power factor $13,040 $16,170 - - $13,040 -
13 2.8114: Change rate schedules or other changes in utility service $7,015 - - - $7,015 -
TOTAL RECOMMENDED $104,736 $140,737 $55,699
1,428,199
kWh
$26,387
-
kW-mo/yr
$20,055 $2,595
-
MMBtu
TOTAL IMPLEMENTED $104,736 $140,737 $55,699
1,428,199
kWh
$26,387
-
kW-mo/yr
$20,055 $2,595
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs