Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

228

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Pottery, ceramics, and plumbing fixture manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SF0616 #04 Y:2024 Use solar heat to make electricty $61,055 $261,561
SF0616 #03 Y:2024 Recharge batteries on during off-peak demand periods $551 $550
SF0616 #02 Y:2024 Eliminate or reduce compressed air usage $292 $292
SF0616 #01 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $9,331 $1,971
WV0635 #11 Y:2022 Eliminate or reduce compressed air usage $57 $88
WV0635 #10 Y:2022 Develop a repair/replace policy $546 $1,571
WV0635 #09 Y:2022 Establish a predictive maintenance program $672 $1,500
WV0635 #08 Y:2022 Reduce the pressure of compressed air to the minimum required $949 $525
WV0635 #07 Y:2022 Use flow control valves on equipment to optimize water use $2,027 $394
WV0635 #06 Y:2022 Eliminate leaks in inert gas and compressed air lines/ valves $2,309 $218
WV0635 #05 Y:2022 Install set-back timers $3,167 $1,125
WV0635 #04 Y:2022 Upgrade controls on compressors $3,209 $6,354
WV0635 #03 Y:2022 Utilize higher efficiency lamps and/or ballasts $3,990 $4,945
WV0635 #02 Y:2022 Level zero – install control systems for existing equipment $4,325 $5,360
WV0635 #01 Y:2022 Reschedule plant operations or reduce load to avoid peaks $9,179 $6,500
UD1022 #08 Y:2020 Replace existing hvac unit with high efficiency model $64,635 $158,400
UD1022 #07 Y:2020 Install occupancy sensors $3,209 $3,730
UD1022 #06 Y:2020 Utilize higher efficiency lamps and/or ballasts $31,150 $75,000
UD1022 #05 Y:2020 Eliminate leaks in inert gas and compressed air lines/ valves $8,140 $340
UD1022 #04 Y:2020 Reduce the pressure of compressed air to the minimum required $11,787 $14,000