ITAC Assessment: SF0616
ITAC logo
ITAC Assessment: SF0616
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Ceramic tile
NAICS 327110: Pottery, Ceramics, and Plumbing Fixture Manufacturing
SIC 3269: Pottery Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 44
Plant Area 48,000
ft2
Annual Production 41,000
units
Production Hrs. Annual 2,875
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $143,277 643,641
kWh
Electricity Demand $40,494 1,972
kW-mo/yr
Natural Gas $249,809 12,852
MMBtu
TOTAL YEARLY COSTS $433,580
RECOMMENDED SAVINGS* $71,229 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,331 $1,971 $9,331
41,917
kWh
- -
02 2.4239: Eliminate or reduce compressed air usage $292 $292 $211
949
kWh
$81
-
kW-mo/yr
-
03 2.3132: Recharge batteries on during off-peak demand periods $551 $550 - - $551
04 2.9114: Use solar heat to make electricty $61,055 $261,561 $61,055
274,282
kWh
- -
TOTAL RECOMMENDED $71,229 $264,374 $70,597
317,148
kWh
$81
-
kW-mo/yr
$551
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs