Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

649

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Clay product and refractory manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OR0819 #03 Y:2025 Use solar heat to make electricty $4,398 $71,252
OR0819 #02 Y:2025 Use optimum thickness insulation $1,005 $9,448
OR0819 #01 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $16,460 $11,702
SJ0041 #08 Y:2025 Utilize energy-efficient belts and other improved mechanisms $645 $3,293
SJ0041 #07 Y:2025 Re-use or recycle hot or cold process exhaust air $15,818 $11,594
SJ0041 #06 Y:2025 Install occupancy sensors $37,951 $77,070
SJ0041 #05 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $1,968 $1,703
SJ0041 #04 Y:2025 Insulate bare equipment $8,962 $2,910
SJ0041 #03 Y:2025 Turn off equipment when not in use $9,425 -
SJ0041 #02 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $7,904 -
SJ0041 #01 Y:2025 Reduce the pressure of compressed air to the minimum required $1,057 -
AM0960 #04 Y:2025 Use solar heat to make electricty $80,488 $1,250,900
AM0960 #03 Y:2025 Re-size charging openings or add a movable door on equipment $1,654 $204
AM0960 #02 Y:2025 Schedule baking times of small and large components $2,820 $50
AM0960 #01 Y:2025 Optimize plant power factor $47,713 $27,900
TT0316 #11 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $1,763 $1,345
TT0316 #10 Y:2024 Recover waste heat from equipment $5,587 $1,500
TT0316 #09 Y:2024 Reduce the pressure of compressed air to the minimum required $7,504 $60
TT0316 #08 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $10,806 $12,000
TT0316 #07 Y:2024 Turn off equipment when not in use $11,283 $30