Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

31

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Nonmetallic mineral product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OR0774 #04 Y:2023 Use optimum size and capacity equipment $1,255 $1,480
OR0774 #03 Y:2023 Upgrade controls on compressors $10,951 $10,710
OR0774 #02 Y:2023 Re-size charging openings or add a movable door on equipment $22,803 $17,436
OR0774 #01 Y:2023 Replace existing hvac unit with high efficiency model $27,206 $88,913
OR0649 #11 Y:2015 Recover waste heat from equipment $4,941 $19,500
OR0649 #10 Y:2015 Install occupancy sensors $1,371 $2,065
OR0649 #09 Y:2015 Eliminate leaks in inert gas and compressed air lines/ valves $2,638 $1,819
OR0649 #08 Y:2015 Eliminate leaks in inert gas and compressed air lines/ valves $3,277 $2,139
OR0649 #07 Y:2015 Reduce the pressure of compressed air to the minimum required $572 $1,000
OR0649 #06 Y:2015 Use solar heat to make electricty $23,387 $10,298
OR0649 #05 Y:2015 Turn off equipment when not in use $1,536 $438
OR0649 #04 Y:2015 Convert liquid heaters from underfiring to immersion or submersion heating $5,913 $4,455
OR0649 #03 Y:2015 Turn off equipment when not in use $2,825 -
OR0649 #02 Y:2015 Utilize higher efficiency lamps and/or ballasts $7,484 $2,065
OR0649 #01 Y:2015 Turn off equipment when not in use $18,604 $16,250
OR0504 #07 Y:2006 Turn off equipment during breaks, reduce operating time $2,500 $1,000
OR0504 #06 Y:2006 Redesign process $6,100 $5,000
OR0504 #05 Y:2006 Minimize operation of equipment maintained in standby condition $23,000 -
OR0504 #04 Y:2006 Use a less expensive method of waste removal $28,000 -