ITAC Assessment: OR0774
ITAC logo
ITAC Assessment: OR0774
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Sheet Glass
NAICS 327211: Flat Glass Manufacturing
SIC 3211: Flat Glass
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 75,000
ft2
Annual Production 4,400,000
lb
Production Hrs. Annual 3,744
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $127,360 1,800,354
kWh
Electricity Demand $65,242 8,593
kW-mo/yr
Electricity Fees $17,186 -
Natural Gas $13,248 1,022
MMBtu
TOTAL YEARLY COSTS $223,036
RECOMMENDED SAVINGS* $62,215 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7232: Replace existing hvac unit with high efficiency model $27,206 $88,913 $4,651
46,629
kWh
- $22,555
-
MMBtu
02 2.1122: Re-size charging openings or add a movable door on equipment $22,803 $17,436 - - $22,803
-
MMBtu
03 2.4224: Upgrade controls on compressors $10,951 $10,710 $10,951
109,791
kWh
- -
04 2.4323: Use optimum size and capacity equipment $1,255 $1,480 $992
9,948
kWh
$263
-
kW-mo/yr
-
TOTAL RECOMMENDED $62,215 $118,539 $16,594
166,368
kWh
$263
-
kW-mo/yr
$45,358
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs