Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

158

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Nonmetallic mineral product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SU0271 #07 Y:2008 Install / repair insulation on steam lines $31,841 $16,299
SU0271 #06 Y:2008 Install occupancy sensors $773 $249
SU0271 #05 Y:2008 Insulate feedwater tank $3,428 $746
SU0271 #04 Y:2008 Eliminate leaks in inert gas and compressed air lines/ valves $13,111 $1,559
SU0271 #03 Y:2008 Install compressor air intakes in coolest locations $16,435 $2,841
SU0271 #02 Y:2008 Reduce the pressure of compressed air to the minimum required $36,827 $3,125
SU0271 #01 Y:2008 Pay bills on time to avoid late fees $2,751 -
SU0254 #12 Y:2007 Utilize higher efficiency lamps and/or ballasts $694 $909
SU0254 #11 Y:2007 Install compressor air intakes in coolest locations $4,604 $6,140
SU0254 #10 Y:2007 Use waste heat from flue gases to heat space conditioning air $86,095 $97,983
SU0254 #09 Y:2007 Utilize higher efficiency lamps and/or ballasts $73,567 $63,450
SU0254 #08 Y:2007 Install occupancy sensors $24,092 $13,688
SU0254 #07 Y:2007 Preheat combustion air with waste heat $25,275 $12,148
SU0254 #06 Y:2007 Insulate bare equipment $440 $69
SU0254 #05 Y:2007 Eliminate leaks in inert gas and compressed air lines/ valves $2,048 $381
SU0254 #04 Y:2007 Replace fossil fuel equipment with electrical equipment $18,564 $2,486
SU0254 #03 Y:2007 Utilize energy-efficient belts and other improved mechanisms $1,618 -
SU0254 #02 Y:2007 Use synthetic lubricant $3,743 -
SU0254 #01 Y:2007 Reduce the pressure of compressed air to the minimum required $4,902 -
SU0238 #12 Y:2006 Recover waste heat from equipment $12,004 $67,500