Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product HPFS, LCD image mask, ULE
NAICS 327212: Other Pressed and Blown Glass and Glassware Manufacturing
SIC 3229: Pressed and Blown Glass and Glassware, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 300
Plant Area 275,000
ft2
Annual Production 1,500
pieces
Production Hrs. Annual 8,760
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,497,993 24,979,932
kWh
Natural Gas $1,783,000 147,706
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $245,642 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $140,983

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $4,902 - $4,902
49,020
kWh
- - -
02 2.4314: Use synthetic lubricant $3,743 - $3,743
37,425
kWh
- - -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,618 - $1,618
16,183
kWh
- - -
04 2.1321: Replace fossil fuel equipment with electrical equipment $18,564 $2,486 - $18,564
-
MMBtu
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,048 $381 $2,048
20,480
kWh
- - -
06 2.2511: Insulate bare equipment $440 $69 $440
4,395
kWh
- - -
07 2.2442: Preheat combustion air with waste heat $25,275 $12,148 - $25,275
-
MMBtu
- -
08 2.7135: Install occupancy sensors $24,092 $13,688 $24,092
240,918
kWh
- - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $73,567 $63,450 $73,567
735,665
kWh
- - -
10 2.2426: Use waste heat from flue gases to heat space conditioning air $86,095 $97,983 - $86,095
-
MMBtu
- -
11 2.4221: Install compressor air intakes in coolest locations $4,604 $6,140 $4,604
46,040
kWh
- - -
12 2.7142: Utilize higher efficiency lamps and/or ballasts $694 $909 $237
2,365
kWh
- $337 $120
TOTAL RECOMMENDED $245,642 $197,254 $115,251
1,152,491
kWh
$129,934
-
MMBtu
$337 $120
TOTAL IMPLEMENTED $140,983 $96,785 $115,251
1,152,491
kWh
$25,275
-
MMBtu
$337 $120
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs