Assessment Year | 2007 |
---|---|
Principal Product | HPFS, LCD image mask, ULE |
NAICS | 327212: Other Pressed and Blown Glass and Glassware Manufacturing |
SIC | 3229: Pressed and Blown Glass and Glassware, Not Elsewhere Classified |
Sales Range | $100 M to 500M |
# of Employees | 300 |
Plant Area |
275,000
ft2
|
Annual Production | 1,500
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $2,497,993 | 24,979,932 |
kWh
|
$0.100 |
Natural Gas | $1,783,000 | 147,706 |
MMBtu
|
$12.07 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $245,642 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $140,983 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,902 | - |
$4,902
49,020
kWh
|
- | - | - | |
02 | 2.4314: Use synthetic lubricant | $3,743 | - |
$3,743
37,425
kWh
|
- | - | - | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,618 | - |
$1,618
16,183
kWh
|
- | - | - | |
04 | 2.1321: Replace fossil fuel equipment with electrical equipment | $18,564 | $2,486 | - |
$18,564
-
MMBtu
|
- | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,048 | $381 |
$2,048
20,480
kWh
|
- | - | - | |
06 | 2.2511: Insulate bare equipment | $440 | $69 |
$440
4,395
kWh
|
- | - | - | |
07 | 2.2442: Preheat combustion air with waste heat | $25,275 | $12,148 | - |
$25,275
-
MMBtu
|
- | - | |
08 | 2.7135: Install occupancy sensors | $24,092 | $13,688 |
$24,092
240,918
kWh
|
- | - | - | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $73,567 | $63,450 |
$73,567
735,665
kWh
|
- | - | - | |
10 | 2.2426: Use waste heat from flue gases to heat space conditioning air | $86,095 | $97,983 | - |
$86,095
-
MMBtu
|
- | - | |
11 | 2.4221: Install compressor air intakes in coolest locations | $4,604 | $6,140 |
$4,604
46,040
kWh
|
- | - | - | |
12 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $694 | $909 |
$237
2,365
kWh
|
- | $337 | $120 | |
TOTAL RECOMMENDED | $245,642 | $197,254 |
$115,251
1,152,491
kWh
|
$129,934
-
MMBtu
|
$337 | $120 | ||
TOTAL IMPLEMENTED | $140,983 | $96,785 |
$115,251
1,152,491
kWh
|
$25,275
-
MMBtu
|
$337 | $120 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs