Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Nonmetallic mineral product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
DL0231 #08 Y:2023 Repair furnaces and oven doors so that they seal efficiently $266,000 $385,800
DL0231 #07 Y:2023 Improve combustion control capability $211,766 $21,800
DL0231 #06 Y:2023 Maintain machines to reduce leaks $441,845 $39,600
DL0231 #05 Y:2023 Maintain machines to reduce leaks $132,876 $34,600
DL0231 #04 Y:2023 Insulate bare equipment $25,112 $9,768
DL0231 #03 Y:2023 Use or replace with energy efficient substitutes $149,450 $333,800
DL0231 #02 Y:2023 Replace existing equipment with more suitable substitutes $229,694 $2,880,000
DL0231 #01 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $172,461 $34,600
DL0224 #04 Y:2023 Utilize higher efficiency lamps and/or ballasts $1,382 $780
DL0224 #03 Y:2023 Eliminate leaks in high pressure reducing stations $14,800 $70,000
DL0224 #02 Y:2023 Use or replace with energy efficient substitutes $18,258 $76,600
DL0224 #01 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $25,584 $18,000
WV0547 #12 Y:2017 Develop a repair/replace policy $102 $348
WV0547 #11 Y:2017 Reduce the pressure of compressed air to the minimum required $133 $25
WV0547 #10 Y:2017 Analyze flue gas for proper air/fuel ratio $175 $850
WV0547 #09 Y:2017 Establish a predictive maintenance program $243 $1,000
WV0547 #08 Y:2017 Use adjustable frequency drive or multiple speed motors on existing system $412 $2,050
WV0547 #07 Y:2017 Use evaporation to concentrate material $563 $700
WV0547 #06 Y:2017 Adjust burners for efficient operation $970 $4,600
WV0547 #05 Y:2017 Re-size charging openings or add movable cover or door $1,360 $2,700