| Assessment Year | 2017 |
|---|---|
| Principal Product | Glassware-Hand-blown |
| NAICS | 327212: Other Pressed and Blown Glass and Glassware Manufacturing |
| SIC | 3229: Pressed and Blown Glass and Glassware, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 51 |
| Plant Area |
8,000
ft2
|
| Annual Production | 286
ton
|
| Production Hrs. Annual | 6,552
hrs
|
| Location (State) | Maryland |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $254,616 | 3,246,195 |
kWh
|
$0.078 | |
| Natural Gas | $110,904 | 19,997 |
MMBtu
|
$5.55 | |
| Waste Disposal Costs | |||||
| Water Usage | $273 | 58 |
Tgal
|
$4.67 | |
| Water Disposal | $395 | 58 |
Tgal
|
$6.76 | |
| TOTAL YEARLY COSTS | $366,188 | ||||
| RECOMMENDED SAVINGS* | $33,184 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $21,283 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Usage Savings | Water Disposal Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.2511: Insulate bare equipment | $15,992 | $5,658 |
$13,073
166,663
kWh
|
$2,919
-
MMBtu
|
- | - | - | |
| 02 | 2.1116: Improve combustion control capability | $7,947 | $25,500 |
$7,947
101,310
kWh
|
- | - | - | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,491 | $9,434 |
$3,491
44,505
kWh
|
- | - | - | - | |
| 04 | 2.4239: Eliminate or reduce compressed air usage | $1,796 | $1,263 |
$1,796
22,913
kWh
|
- | - | - | - | |
| 05 | 2.2531: Re-size charging openings or add movable cover or door | $1,360 | $2,700 | - |
$1,360
-
MMBtu
|
- | - | - | |
| 06 | 2.1133: Adjust burners for efficient operation | $970 | $4,600 | - |
$5,250
-
MMBtu
|
- | - | $(-4,280.0) | |
| 07 | 3.3131: Use evaporation to concentrate material | $563 | $700 | - | - |
$273
-
Tgal
|
$395
-
Tgal
|
$(-105.0) | |
| 08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $412 | $2,050 |
$412
5,250
kWh
|
- | - | - | - | |
| 09 | 2.4157: Establish a predictive maintenance program | $243 | $1,000 |
$901
11,492
kWh
|
- | - | - | $(-658.0) | |
| 10 | 2.1233: Analyze flue gas for proper air/fuel ratio | $175 | $850 | - |
$250
-
MMBtu
|
- | - | $(-75.0) | |
| 11 | 2.4231: Reduce the pressure of compressed air to the minimum required | $133 | $25 |
$133
1,690
kWh
|
- | - | - | - | |
| 12 | 2.4151: Develop a repair/replace policy | $102 | $348 |
$152
1,939
kWh
|
- | - | - | $(-50.0) | |
| TOTAL RECOMMENDED | $33,184 | $54,128 |
$27,905
355,762
kWh
|
$9,779
-
MMBtu
|
$273
-
Tgal
|
$395
-
Tgal
|
$(-5,168.0) | ||
| TOTAL IMPLEMENTED | $21,283 | $23,592 |
$17,877
227,910
kWh
|
$8,419
-
MMBtu
|
- | - | $(-5,013.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Usage Savings | Water Disposal Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs