ITAC Assessment: DL0224
ITAC logo
ITAC Assessment: DL0224
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Drywall finishing products
NAICS 327420: Gypsum Product Manufacturing
SIC 3275: Gypsum Products
Sales Range $10
M
to 50
M
# of Employees 54
Plant Area 188,560
ft2
Annual Production 20,000
Tgal
Production Hrs. Annual 6,900
hrs
Location (State) Maryland

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $236,686 2,498,819
kWh
Electricity Demand $31,264 7,107
kW-mo/yr
Electricity Fees $1,163 -
Natural Gas $25,830 1,886
MMBtu
TOTAL YEARLY COSTS $294,943
RECOMMENDED SAVINGS* $60,024 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $25,584 $18,000 $23,748
249,984
kWh
$1,836
-
kW-mo/yr
02 2.4322: Use or replace with energy efficient substitutes $18,258 $76,600 $18,258
170,640
kWh
-
03 2.2134: Eliminate leaks in high pressure reducing stations $14,800 $70,000 $14,800
138,320
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,382 $780 $1,382
12,917
kWh
-
TOTAL RECOMMENDED $60,024 $165,380 $58,188
571,861
kWh
$1,836
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs