Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

41

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Nonmetallic mineral product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MA0838 #06 Y:2022 Turn off equipment when not in use $1,706 $250
MA0838 #05 Y:2022 Use adjustable frequency drive or multiple speed motors on existing system $4,687 $6,969
MA0838 #04 Y:2022 Reduce the pressure of compressed air to the minimum required $6,501 $500
MA0838 #03 Y:2022 Use or replace with energy efficient substitutes $13,385 $65,000
MA0838 #02 Y:2022 Use cooling tower or economizer to replace chiller cooling $13,878 $6,206
MA0838 #01 Y:2022 Apply for tax-free status for energy purchases $32,666 $1,500
MA0776 #03 Y:2017 Install / repair insulation on steam lines $973 $301
MA0776 #02 Y:2017 Use adjustable frequency drive or multiple speed motors on existing system $6,365 $15,725
MA0776 #01 Y:2017 Install / repair insulation on steam lines $35,581 $238,058
MA0774 #05 Y:2017 Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown $2,908 $1,775
MA0774 #04 Y:2017 Install / repair insulation on steam lines $2,868 $652
MA0774 #03 Y:2017 Install / repair insulation on steam lines $4,135 $27,198
MA0774 #02 Y:2017 Improve combustion control capability $12,851 $21,075
MA0774 #01 Y:2017 Use solar heat for heat $58,825 $627,522
MA0753 #06 Y:2015 Insulate glazing, walls, ceilings, and roofs $842 $2,152
MA0753 #05 Y:2015 Insulate bare equipment $1,226 $1,400
MA0753 #04 Y:2015 Install occupancy sensors $1,608 $4,608
MA0753 #03 Y:2015 Reduce ventilation air $4,632 $6,000
MA0753 #02 Y:2015 Reduce ventilation air $7,290 $5,575
MA0753 #01 Y:2015 Replace electrically-operated equipment with fossil fuel equipment $18,534 $67,200