Assessment Year | 2017 |
---|---|
Principal Product | Precast concrete |
NAICS | 327390: Other Concrete Product Manufacturing |
SIC | 3272: Concrete Products, Except Block and Brick |
Sales Range | $100 M to 500M |
# of Employees | 425 |
Plant Area |
100,000
ft2
|
Annual Production | 66,300
units
|
Production Hrs. Annual | 5,890
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $90,463 | 790,911 |
kWh
|
$0.11 |
Electricity Demand | $19,851 | 2,006 |
kW-mo/yr
|
$9.90 |
Electricity Fees | $4,260 | - |
|
- |
Natural Gas | $150,476 | 20,673 |
MMBtu
|
$7.28 |
TOTAL YEARLY COSTS | $265,050 | |||
RECOMMENDED SAVINGS* | $81,587 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $64,601 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.9113: Use solar heat for heat | $58,825 | $627,522 |
$58,825
516,007
kWh
|
- | |
02 | 2.1116: Improve combustion control capability | $12,851 | $21,075 |
$1,504
13,191
kWh
|
$11,347
-
MMBtu
|
|
03 | 2.2136: Install / repair insulation on steam lines | $4,135 | $27,198 | - |
$4,135
-
MMBtu
|
|
04 | 2.2136: Install / repair insulation on steam lines | $2,868 | $652 | - |
$2,868
-
MMBtu
|
|
05 | 2.7316: Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown | $2,908 | $1,775 |
$2,908
25,506
kWh
|
- | |
TOTAL RECOMMENDED | $81,587 | $678,222 |
$63,237
554,704
kWh
|
$18,350
-
MMBtu
|
||
TOTAL IMPLEMENTED | $64,601 | $629,949 |
$61,733
541,513
kWh
|
$2,868
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs