ITAC Assessment: MA0774
ITAC logo
ITAC Assessment: MA0774
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Precast concrete
NAICS 327390: Other Concrete Product Manufacturing
SIC 3272: Concrete Products, Except Block and Brick
Sales Range $100
M
to 500
M
# of Employees 425
Plant Area 100,000
ft2
Annual Production 66,300
units
Production Hrs. Annual 5,890
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $90,463 790,911
kWh
Electricity Demand $19,851 2,006
kW-mo/yr
Electricity Fees $4,260 -
Natural Gas $150,476 20,673
MMBtu
TOTAL YEARLY COSTS $265,050
RECOMMENDED SAVINGS* $81,587 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $64,601

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.9113: Use solar heat for heat $58,825 $627,522 $58,825
516,007
kWh
-
02 2.1116: Improve combustion control capability $12,851 $21,075 $1,504
13,191
kWh
$11,347
-
MMBtu
03 2.2136: Install / repair insulation on steam lines $4,135 $27,198 - $4,135
-
MMBtu
04 2.2136: Install / repair insulation on steam lines $2,868 $652 - $2,868
-
MMBtu
05 2.7316: Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown $2,908 $1,775 $2,908
25,506
kWh
-
TOTAL RECOMMENDED $81,587 $678,222 $63,237
554,704
kWh
$18,350
-
MMBtu
TOTAL IMPLEMENTED $64,601 $629,949 $61,733
541,513
kWh
$2,868
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs