| Assessment Year | 2017 |
|---|---|
| Principal Product | Central-mixed concrete manufacturing |
| NAICS | 327320: Ready-Mix Concrete Manufacturing |
| SIC | 3273: Ready-Mixed Concrete |
| Sales Range | $50 M to 100M |
| # of Employees | 215 |
| Plant Area |
280,000
ft2
|
| Annual Production | 91,000
units
|
| Production Hrs. Annual | 2,470
hrs
|
| Location (State) | Massachusetts |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $103,036 | 775,551 |
kWh
|
$0.13 |
| Electricity Demand | $49,411 | 4,976 |
kW-mo/yr
|
$9.93 |
| Natural Gas | $132,609 | 22,222 |
MMBtu
|
$5.97 |
| TOTAL YEARLY COSTS | $285,056 | |||
| RECOMMENDED SAVINGS* | $42,919 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $7,338 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.2136: Install / repair insulation on steam lines | $35,581 | $238,058 | - |
$35,581
-
MMBtu
|
|
| 02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $6,365 | $15,725 |
$6,365
47,856
kWh
|
- | |
| 03 | 2.2136: Install / repair insulation on steam lines | $973 | $301 | - |
$973
-
MMBtu
|
|
| TOTAL RECOMMENDED | $42,919 | $254,084 |
$6,365
47,856
kWh
|
$36,554
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $7,338 | $16,026 |
$6,365
47,856
kWh
|
$973
-
MMBtu
|
||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs