ITAC Assessment: MA0776
ITAC logo
ITAC Assessment: MA0776
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Central-mixed concrete manufacturing
NAICS 327320: Ready-Mix Concrete Manufacturing
SIC 3273: Ready-Mixed Concrete
Sales Range $50
M
to 100
M
# of Employees 215
Plant Area 280,000
ft2
Annual Production 91,000
units
Production Hrs. Annual 2,470
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $103,036 775,551
kWh
Electricity Demand $49,411 4,976
kW-mo/yr
Natural Gas $132,609 22,222
MMBtu
TOTAL YEARLY COSTS $285,056
RECOMMENDED SAVINGS* $42,919 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,338

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2136: Install / repair insulation on steam lines $35,581 $238,058 - $35,581
-
MMBtu
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,365 $15,725 $6,365
47,856
kWh
-
03 2.2136: Install / repair insulation on steam lines $973 $301 - $973
-
MMBtu
TOTAL RECOMMENDED $42,919 $254,084 $6,365
47,856
kWh
$36,554
-
MMBtu
TOTAL IMPLEMENTED $7,338 $16,026 $6,365
47,856
kWh
$973
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs