53
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UL2615 #04 Y:2026 | 04 | 2026 | Use solar heat to make electricty | $33,051 | $262,820 |
n/a
|
| UL2615 #03 Y:2026 | 03 | 2026 | Use adjustable frequency drive or multiple speed motors on existing system | $13,910 | $18,224 |
n/a
|
| UL2615 #02 Y:2026 | 02 | 2026 | Utilize higher efficiency lamps and/or ballasts | $1,206 | $1,761 |
n/a
|
| UL2615 #01 Y:2026 | 01 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $3,149 | $735 |
n/a
|
| UL2411 #06 Y:2024 | 06 | 2024 | Use waste heat from hot flue gases to preheat | $35,308 | $50,000 | |
| UL2411 #05 Y:2024 | 05 | 2024 | Reschedule plant operations or reduce load to avoid peaks | $5,372 | $5,000 | |
| UL2411 #04 Y:2024 | 04 | 2024 | Use insulation in furnaces to facilitate heating / cooling | $4,053 | $13,653 | |
| UL2411 #03 Y:2024 | 03 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,717 | $1,995 | |
| UL2411 #02 Y:2024 | 02 | 2024 | Lower temperature during the winter season and vice-versa | $746 | $2,700 | |
| UL2411 #01 Y:2024 | 01 | 2024 | Use solar heat to make electricty | $76,606 | $698,579 | |
| UK1604 #10 Y:2016 | 10 | 2016 | Recover waste heat from equipment | $2,729 | $6,000 | |
| UK1604 #09 Y:2016 | 09 | 2016 | Eliminate leaks in inert gas and compressed air lines/ valves | $4,645 | $1,200 | |
| UK1604 #08 Y:2016 | 08 | 2016 | Install / repair insulation on steam lines | $56 | $61 | |
| UK1604 #07 Y:2016 | 07 | 2016 | Recover waste heat from equipment | $1,094 | $5,000 | |
| UK1604 #06 Y:2016 | 06 | 2016 | Recycle air for heating, ventilation and air conditioning | $2,304 | $3,620 | |
| UK1604 #05 Y:2016 | 05 | 2016 | Analyze flue gas for proper air/fuel ratio | $7,018 | $3,500 | |
| UK1604 #04 Y:2016 | 04 | 2016 | Install occupancy sensors | $153 | $280 | |
| UK1604 #03 Y:2016 | 03 | 2016 | Utilize higher efficiency lamps and/or ballasts | $166 | $196 | |
| UK1604 #02 Y:2016 | 02 | 2016 | Utilize higher efficiency lamps and/or ballasts | $29,425 | $67,500 | |
| UK1604 #01 Y:2016 | 01 | 2016 | Optimize plant power factor | $14,750 | $8,715 |