Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

178

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Nonmetallic mineral product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UF0641 #09 Y:2025 Improve space comfort conditioning $27,043 $4,272
UF0641 #08 Y:2025 Install refrigeration system to cool product $127,680 $12,000
UF0641 #07 Y:2025 Utilize energy-efficient belts and other improved mechanisms $2,042 -
UF0641 #06 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $2,417 $356
UF0641 #05 Y:2025 Keep equipment clean $3,800 $1,300
UF0641 #04 Y:2025 Reduce the pressure of compressed air to the minimum required $53,750 -
UF0641 #03 Y:2025 Use solar heat to make electricty $136,120 $806,520
UF0641 #02 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $149,445 $229,832
UF0641 #01 Y:2025 Use demand controller or load shedder $343,863 $301,728
UF0601 #08 Y:2023 Improve space comfort conditioning $34,014 $3,179
UF0601 #07 Y:2023 Level three - install or modify control system with communication and nonlocal external information (i.e. weather foreca $61,813 $29,295
UF0601 #06 Y:2023 Level one – add communication using iiot devices to existing control system to modify operations $74,558 -
UF0601 #05 Y:2023 Utilize energy-efficient belts and other improved mechanisms $12,983 -
UF0601 #04 Y:2023 Improve air circulation with destratification fans / other methods $32,141 $49,680
UF0601 #03 Y:2023 Reduce combustion air flow to optimum $280,640 $30,000
UF0601 #02 Y:2023 Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $1,202,647 $3,920,000
UF0601 #01 Y:2023 Change rate schedules or other changes in utility service $9,858,540 -
UF0600 #07 Y:2023 Improve space comfort conditioning $32,555 $3,179
UF0600 #06 Y:2023 Install timers on light switches in little used areas $1,118 $591
UF0600 #05 Y:2023 Minimize condenser cooling water temperature $1,132 $1,440