ITAC Assessment: UF0641
ITAC logo
ITAC Assessment: UF0641
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Fiberglass Insulation
NAICS 327993: Mineral Wool Manufacturing
SIC 3296: Mineral Wool
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 700,000
ft2
Annual Production 71,947,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,348,423 56,083,200
kWh
Electricity Demand $1,083,166 91,910
kW-mo/yr
Electricity Fees $472,015 -
Natural Gas $168,051 123,990
MMBtu
Waste Disposal Costs
Water Usage $149,183 37,774
Tgal
TOTAL YEARLY COSTS $4,220,838
RECOMMENDED SAVINGS* $846,160 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings
01 2.3191: Use demand controller or load shedder $343,863 $301,728 $235,549
5,608,320
kWh
$108,314
-
kW-mo/yr
- -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $149,445 $229,832 $149,445
3,558,213
kWh
- - -
03 2.9114: Use solar heat to make electricty $136,120 $806,520 $65,410
1,557,370
kWh
$70,710
-
kW-mo/yr
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $53,750 - $53,750
1,279,763
kWh
- - -
05 2.6125: Keep equipment clean $3,800 $1,300 $3,800
90,484
kWh
- - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,417 $356 $2,417
57,554
kWh
- - -
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,042 - $1,615
38,458
kWh
- $221 $206
08 4.113: Install refrigeration system to cool product $127,680 $12,000 $(-16,114.0)
(-384,389)
kWh
$(-6,206.0)
-
kW-mo/yr
- $150,000
09 4.424: Improve space comfort conditioning $27,043 $4,272 $(-604.0)
(-14,387)
kWh
$(-745.0)
-
kW-mo/yr
- $28,392
TOTAL RECOMMENDED $846,160 $1,356,008 $495,268
11,791,386
kWh
$172,073
-
kW-mo/yr
$221 $178,598
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs