Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,691

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Nonmetallic mineral product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WV0679 #04 Y:2025 Eliminate or reduce compressed air usage $179 $185
WV0679 #03 Y:2025 Reduce the pressure of compressed air to the minimum required $283 $25
WV0679 #02 Y:2025 Utilize higher efficiency lamps and/or ballasts $1,114 $3,943
WV0679 #01 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $2,875 $900
DL0251 #09 Y:2024 Utilize higher efficiency lamps and/or ballasts $8,031 $7,046
DL0251 #08 Y:2024 Use radiant heater for spot heating $10,284 $6,448
DL0251 #07 Y:2024 Reprocess spent oils on site for re-use $1,561 $16,500
DL0251 #06 Y:2024 Use or replace with energy efficient substitutes $1,096 $13,500
DL0251 #05 Y:2024 Eliminate leaks in high pressure reducing stations $386 $1,750
DL0251 #04 Y:2024 Eliminate or reduce compressed air usage $1,180 $1,075
DL0251 #03 Y:2024 Turn off equipment during breaks, reduce operating time $1,824 -
DL0251 #02 Y:2024 Lower temperature during the winter season and vice-versa $2,414 -
DL0251 #01 Y:2024 Use computer programs to optimize hvac performance $2,231 -
WV0676 #08 Y:2024 Eliminate or reduce compressed air usage $49 $140
WV0676 #07 Y:2024 Upgrade controls on compressors $329 $1,415
WV0676 #06 Y:2024 Utilize higher efficiency lamps and/or ballasts $1,979 $653
WV0676 #05 Y:2024 Install occupancy sensors $2,075 $3,893
WV0676 #04 Y:2024 Develop a repair/replace policy $3,482 $1,197
WV0676 #03 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $4,750 $6,504
WV0676 #02 Y:2024 Establish a predictive maintenance program $4,780 $5,200