Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,675

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Nonmetallic mineral product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WV0676 #08 Y:2024 Eliminate or reduce compressed air usage $49 $140
WV0676 #07 Y:2024 Upgrade controls on compressors $329 $1,415
WV0676 #06 Y:2024 Utilize higher efficiency lamps and/or ballasts $1,979 $653
WV0676 #05 Y:2024 Install occupancy sensors $2,075 $3,893
WV0676 #04 Y:2024 Develop a repair/replace policy $3,482 $1,197
WV0676 #03 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $4,750 $6,504
WV0676 #02 Y:2024 Establish a predictive maintenance program $4,780 $5,200
WV0676 #01 Y:2024 Insulate bare equipment $64,709 $86,472
LE0588 #08 Y:2024 Install occupancy sensors $38 $140
LE0588 #07 Y:2024 Replace obsolete burners with more efficient ones $175,084 $635,000
LE0588 #06 Y:2024 Re-use or recycle hot or cold process exhaust air $938 $2,500
LE0588 #05 Y:2024 Replace fossil fuel equipment with electrical equipment $21,726 $56,274
LE0588 #04 Y:2024 Reschedule plant operations or reduce load to avoid peaks $13,600 $26,934
LE0588 #03 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $2,412 $1,256
LE0588 #02 Y:2024 Reduce the pressure of compressed air to the minimum required $1,235 $100
LE0588 #01 Y:2024 Pay utility bills on time $1,523 -
UL2411 #06 Y:2024 Use waste heat from hot flue gases to preheat $35,308 $50,000
UL2411 #05 Y:2024 Reschedule plant operations or reduce load to avoid peaks $5,372 $5,000
UL2411 #04 Y:2024 Use insulation in furnaces to facilitate heating / cooling $4,053 $13,653
UL2411 #03 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $1,717 $1,995