Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,824

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Nonmetallic mineral product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UF0641 #09 Y:2025 Improve space comfort conditioning $27,043 $4,272
UF0641 #08 Y:2025 Install refrigeration system to cool product $127,680 $12,000
UF0641 #07 Y:2025 Utilize energy-efficient belts and other improved mechanisms $2,042 -
UF0641 #06 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $2,417 $356
UF0641 #05 Y:2025 Keep equipment clean $3,800 $1,300
UF0641 #04 Y:2025 Reduce the pressure of compressed air to the minimum required $53,750 -
UF0641 #03 Y:2025 Use solar heat to make electricty $136,120 $806,520
UF0641 #02 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $149,445 $229,832
UF0641 #01 Y:2025 Use demand controller or load shedder $343,863 $301,728
SD0682 #09 Y:2025 Install occupancy sensors $5,195 $2,979
SD0682 #08 Y:2025 Change method of deionized water production $3,324 $3,000
SD0682 #07 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $177 $678
SD0682 #06 Y:2025 Reduce the pressure of compressed air to the minimum required $1,149 -
SD0682 #05 Y:2025 Install direct acting units in place of compressed air pressure system in safety system $838 $1,400
SD0682 #04 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $12,476 $14,316
SD0682 #03 Y:2025 Utilize higher efficiency lamps and/or ballasts $7,348 $7,257
SD0682 #02 Y:2025 Use battery storage for demand control $613,937 $43,189
SD0682 #01 Y:2025 Use solar heat to make electricty $15,536 $28,350
UW2515 #04 Y:2025 Use battery storage for demand control $20,506 $16,909
UW2515 #03 Y:2025 Install occupancy sensors $2,230 $1,712